6
OPERATING PROCEDURES
6-4
Model 0738
Operating Procedures
12.
Install the front drip tray bracket, rubber
drip tray, and splash shield under the door
spout.
.
Mix Pump Assembly
1. Inspect the rubber and plastic pump parts.
The O-rings must be in 100% good condition
for the pump and entire machine to operate
properly. They cannot properly serve their
intended function if nicks, cuts, or holes in the
material are present.
Inspect the plastic pump parts for cracks,
wear, and delamination of plastic.
Replace any worn, damaged, or
inoperable parts immediately.
2. Place the pump body O-ring in the groove.
3. Place the two pump O-rings into the groove
on the back of the pump body and lubricate
them.
4. Lubricate the interior surfaces of the pump
body (the rear wall
, pin, and bushing).
5.
Insert the drive gear on the bushing; check
that the upper face of the gear is flush with the
rim of the pump body.
Summary of Contents for 0738
Page 20: ...4 OPERATOR PARTS IDENTIFICATION 4 6 Model 0738 Operator Parts Identification...
Page 50: ...8 TROUBLESHOOTING GUIDE 8 4 Model 0738 Troubleshooting Guide...
Page 52: ...9 PARTS REPLACEMENT SCHEDULE 9 2 Model 0738 Parts Replacement Schedule...
Page 56: ...10 LIMITED WARRANTY ON MACHINES 10 4 Model 0738 Limited Warranty on Machines...
Page 60: ...11 LIMITED WARRANTY ON PARTS 11 4 Model 0738 Limited Warranty on Parts...