Working Operation of the machine 5
TW9
53
5 Working Operation of the machine
5.1 General notes
Daily before start of operation and after
every attachment change, check the
correct fastening of the work attachments
as well as the correct locking of the
quick-mount hitch.
The bucket is to be carefully moved at
low height.
•
Before commencing loading work, memorize
the lever controls well.
•
During loading operations, driving and work
movements should flow in smooth succession.
•
Drive slowly when familiarizing yourself with the
controls.
5.1.1 Lever controls
1
Lowers the lifting frame, float position
2 Opens
3 Closes
4 Dumps
5
Travels forwards and backwards
6
Lifts lifting installation
7 Tilts
back
* For grading work, only tilt the joystick
half way, because if it is tilted all the way
the "regeneration" function takes effect.
L1002_Hebelst
2
3
4
5
6
7
1
Fig. – Lever controls
Summary of Contents for TW9
Page 6: ...Table of Contents TW9...
Page 12: ...6 TW9...
Page 42: ...3 Technical data 36 TW9...
Page 46: ...4 Operation 40 TW9 Instrument panel Fig 10 2 Operator controls...
Page 58: ...4 Operation 52 TW9...
Page 112: ...9 Appendix 106 TW9...