DELIVERY AND HANDING-OVER INSTRUCTIONS
The following checklist is to be followed when handing over the machine to
the dealer/ customer:
1. Operating Instructions
The Operating Instructions should be read side by side, and be explained in
detail through practical training on the machine.
Items which are particularly important include:
•
Accident Prevention Regulations published by the employer’s liability
insurance associations in the users country
•
Technical
data
•
Operator controls, indicating and warning elements
•
Checks before putting the machine into operation
•
Diesel engine running-in instructions
•
Starting and stopping the diesel engine
•
Explanation of hydrostatic travel drive
•
Driving, speed ranges, notes for driving on roads
•
Recovery and transport of the machine
•
Operation of all functions
•
Operation of quick-attach system
•
Explanation of maintenance intervals and points according to
Maintenance and Inspection Plan by demonstrating and explaining
maintenance points on machine
•
Lubrication intervals and points of lubrication according to lubrication
chart and demonstration of these points on the machine
•
Handing-over of Diesel Engine Operating Instructions
2. Spare parts list
•
Structure of Spare Parts List, Figures and the associated texts
•
Instructions for ordering spare parts - always state the type of machine,
the vehicle identification number ("Fz-Id.Nr".), parts designation,
complete spare part number, number of pieces, delivery address, etc.
3. Warranty
•
Explanation of warranty stipulations
•
Explanation of inspection cards and note on maintenance and
inspection plan.
•
Explanation of how to fill out the warranty/handing-over card correctly
and how to return to Dealer
Wheel Loader
TW9
M a i n t e n a n c e a n d I n s p e c t i o n P l a n
The careful performance of all prescribed inspections is the best
prerequisite for the machines continuous readiness for operation.
All maintenance work mentioned should therefore be performed in the
prescribed sequence with the machine being in warm condition.
The inspections are obligatory.
Failure to do so may adversely affect our warranty coverage.
The machine must be thoroughly cleaned before inspection takes place.
Summary of Contents for TW9
Page 6: ...Table of Contents TW9...
Page 12: ...6 TW9...
Page 42: ...3 Technical data 36 TW9...
Page 46: ...4 Operation 40 TW9 Instrument panel Fig 10 2 Operator controls...
Page 58: ...4 Operation 52 TW9...
Page 112: ...9 Appendix 106 TW9...