![background image](http://html1.mh-extra.com/html/takeuchi/tb285/tb285_operators-manual_3349272034.webp)
1-24
SAFETY
precautionS on
maintenance
Display a “DO NOT OPERATE” alert sign
Severe injury could result if an unauthorized
person should start the engine or touch
controls during inspection or maintenance.
• Before performing maintenance, stop the
engine, remove the key and take it with
you.
precautionS on maintenance
• Display a “DO NOT OPERATE” alert sign
on easy-to-see locations such as on the
starter switch or on control levers.
Use the correct tools
Do not use damaged or weakened tools or
tools designed for other purposes. Use tools
appropriate for the work involved.
Replace safety-critical parts periodically
• Replace fuel hoses periodically. Fuel hoses
wear out over time, even if they do not
show any symptom of wear.
• Regardless of the replacement schedule,
replace immediately if a symptom of wear
is found.
Refer to “List of safety-critical parts” for
further details.
Explosionproof lighting
To prevent an ignition or explosion, use
explosion-proof lights when inspecting fuel,
oil, coolant or battery fluid. Otherwise,
explosion could result causing serious injury
or death.
Summary of Contents for TB285
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 Safety...
Page 44: ...1 34 Safety Safety signs decals...
Page 45: ...1 35 Safety Safety signs decals...
Page 46: ...1 36 Safety Safety signs decals...
Page 47: ...1 37 Safety Safety signs decals...
Page 48: ...1 38...
Page 49: ...2 1 Controls...
Page 103: ...3 1 Operation...
Page 131: ...4 1 Transport...
Page 135: ...4 5 Transport Hoisting the machine...
Page 137: ...5 1 Maintenance...
Page 165: ...5 29 MEMO...
Page 193: ...5 57 Memo...
Page 205: ...6 1 Troubleshooting...
Page 213: ...6 9 Memo...
Page 226: ...6 22...
Page 227: ...7 1 Specifications...
Page 230: ...7 4 Specifications Machine dimensions Mono boom Machine dimensions...
Page 232: ...7 6 Specifications Machine dimensions 2 Piece boom...
Page 234: ...7 8 Specifications Operating ranges Mono boom Operating ranges...
Page 236: ...7 10 Specifications Operating ranges 2 Piece boom...
Page 238: ...7 12 Memo...
Page 240: ...7 14 Specifications Standard arm TB285 Lifting Capacities...
Page 241: ...7 15 Specifications Lifting Capacities Standard arm TB285...
Page 242: ...7 16 Specifications Middle arm TB285 Lifting Capacities...
Page 243: ...7 17 Specifications Middle arm TB285 Lifting Capacities...
Page 244: ...7 18 Specifications Long arm TB285 Lifting Capacities...
Page 245: ...7 19 Specifications Long arm TB285 Lifting Capacities...
Page 246: ...7 20 Specifications Standard arm TB290 Lifting Capacities...
Page 247: ...7 21 Specifications Lifting Capacities Standard arm TB290...
Page 248: ...7 22 Specifications Middle arm TB290 Lifting Capacities...
Page 249: ...7 23 Specifications Middle arm TB290 Lifting Capacities...
Page 250: ...7 24 Specifications Long arm TB290 Lifting Capacities...
Page 251: ...7 25 Specifications Long arm TB290 Lifting Capacities...
Page 252: ...7 26 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 253: ...7 27 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 254: ...7 28 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 255: ...7 29 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 256: ...7 30...
Page 257: ...8 1 Options...