
3-24
OPERATION
parking the machine
parking
Warning
parking the machine
• Park the machine on a flat, rigid and
safe ground. Set the parking brake.
If you must park on a slope or incline,
park the machine securely and block
the movement of the machine.
• When parking on a street, use barriers,
caution signs, lights, etc., so that the
machine can easily be seen even at
night to avoid collision with other
vehicles.
• Before leaving the operator’s seat, raise
the safety lock lever to engage the lock
and stop the engine. Also, be sure to
remove the key, lock the door and
covers, take it with you and store it in a
specified place.
1. Set the left and right travel levers to the
neutral position.
2. Return the throttle controller to set the
engine to low idling.
3. Lower the bucket and the dozer blade to
the ground.
4. Raise the safety lock lever to the locked
position.
5. Stop the engine and remove the key.
Refer to “Stopping the engine” on page
3-5.
For machines equipped with accumulator:
Refer to “Operating the machine with an
accumulator” on page 2-51.
inSpection and checkS after
Stopping the engine
1. Check for oil or water leak and inspect the
working equipment, covers and
undercarriage. If any irregularities are
found, repair.
2. Fill up the fuel tank.
Refer to “Inspecting the fuel level” on page
5-19.
3. Remove any paper scraps or dirt from the
engine room.
4. Remove any mud from the undercarriage.
Locking
Be sure to lock the following places:
• Cab door
• Engine hood
• Covers
Summary of Contents for TB285
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 Safety...
Page 44: ...1 34 Safety Safety signs decals...
Page 45: ...1 35 Safety Safety signs decals...
Page 46: ...1 36 Safety Safety signs decals...
Page 47: ...1 37 Safety Safety signs decals...
Page 48: ...1 38...
Page 49: ...2 1 Controls...
Page 103: ...3 1 Operation...
Page 131: ...4 1 Transport...
Page 135: ...4 5 Transport Hoisting the machine...
Page 137: ...5 1 Maintenance...
Page 165: ...5 29 MEMO...
Page 193: ...5 57 Memo...
Page 205: ...6 1 Troubleshooting...
Page 213: ...6 9 Memo...
Page 226: ...6 22...
Page 227: ...7 1 Specifications...
Page 230: ...7 4 Specifications Machine dimensions Mono boom Machine dimensions...
Page 232: ...7 6 Specifications Machine dimensions 2 Piece boom...
Page 234: ...7 8 Specifications Operating ranges Mono boom Operating ranges...
Page 236: ...7 10 Specifications Operating ranges 2 Piece boom...
Page 238: ...7 12 Memo...
Page 240: ...7 14 Specifications Standard arm TB285 Lifting Capacities...
Page 241: ...7 15 Specifications Lifting Capacities Standard arm TB285...
Page 242: ...7 16 Specifications Middle arm TB285 Lifting Capacities...
Page 243: ...7 17 Specifications Middle arm TB285 Lifting Capacities...
Page 244: ...7 18 Specifications Long arm TB285 Lifting Capacities...
Page 245: ...7 19 Specifications Long arm TB285 Lifting Capacities...
Page 246: ...7 20 Specifications Standard arm TB290 Lifting Capacities...
Page 247: ...7 21 Specifications Lifting Capacities Standard arm TB290...
Page 248: ...7 22 Specifications Middle arm TB290 Lifting Capacities...
Page 249: ...7 23 Specifications Middle arm TB290 Lifting Capacities...
Page 250: ...7 24 Specifications Long arm TB290 Lifting Capacities...
Page 251: ...7 25 Specifications Long arm TB290 Lifting Capacities...
Page 252: ...7 26 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 253: ...7 27 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 254: ...7 28 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 255: ...7 29 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 256: ...7 30...
Page 257: ...8 1 Options...