5-12
MAINTENANCE
maintenance liSt
Inspection and maintenance item
Page
Walk-around inspection
Inspecting by opening the engine hood and covers
5-14
Inspecting by walking around the machine
5-15
Inspecting while sitting in the operator’s seat
5-15
Daily inspection (every 10 hours)
Inspecting and replenishing the coolant
5-16
Inspecting and replenishing the engine oil
5-17
Inspecting the water separator and the fuel filters
5-18
Inspecting the fuel level
5-19
Inspecting the hydraulic oil tank level and replenishing
5-20
Lubricating the working equipment
5-21
After the initial 50 hours (only for new machines)
Replacing the engine oil and the oil filter
5-22
Inspecting and adjusting the fan belt
5-24
Inspecting and adjusting the compressor belt (AC)
5-26
Every 50 hours
Inspecting the crawler belt tension
5-28
Lubricating the slew bearing
5-30
Draining the water from the fuel tank
5-31
Inspecting the battery fluid level and replenishing
5-32
After the initial 250 hours (only for new machines)
Replacing the hydraulic oil return filter
5-34
Replacing the pilot line filter
5-35
Replacing the travel motor gear oil*
5-36
Every 250 hours
Replacing the engine oil and the oil filter
5-37
Inspecting and adjusting the fan belt
5-37
Inspecting and adjusting the compressor belt (AC)
5-37
Cleaning the air cleaner
5-38
Cleaning the radiator fins and oil cooler fins
5-39
Cleaning the air filters (AC)
5-40
Cleaning the condenser (AC)
5-41
Inspecting the refrigerant (gas) level (AC)
5-42
*: If the percentage of the traveling time within the total operating time is high, replace the gear
oil earlier than the specified time.
maintenance liSt
Summary of Contents for TB285
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 Safety...
Page 44: ...1 34 Safety Safety signs decals...
Page 45: ...1 35 Safety Safety signs decals...
Page 46: ...1 36 Safety Safety signs decals...
Page 47: ...1 37 Safety Safety signs decals...
Page 48: ...1 38...
Page 49: ...2 1 Controls...
Page 103: ...3 1 Operation...
Page 131: ...4 1 Transport...
Page 135: ...4 5 Transport Hoisting the machine...
Page 137: ...5 1 Maintenance...
Page 165: ...5 29 MEMO...
Page 193: ...5 57 Memo...
Page 205: ...6 1 Troubleshooting...
Page 213: ...6 9 Memo...
Page 226: ...6 22...
Page 227: ...7 1 Specifications...
Page 230: ...7 4 Specifications Machine dimensions Mono boom Machine dimensions...
Page 232: ...7 6 Specifications Machine dimensions 2 Piece boom...
Page 234: ...7 8 Specifications Operating ranges Mono boom Operating ranges...
Page 236: ...7 10 Specifications Operating ranges 2 Piece boom...
Page 238: ...7 12 Memo...
Page 240: ...7 14 Specifications Standard arm TB285 Lifting Capacities...
Page 241: ...7 15 Specifications Lifting Capacities Standard arm TB285...
Page 242: ...7 16 Specifications Middle arm TB285 Lifting Capacities...
Page 243: ...7 17 Specifications Middle arm TB285 Lifting Capacities...
Page 244: ...7 18 Specifications Long arm TB285 Lifting Capacities...
Page 245: ...7 19 Specifications Long arm TB285 Lifting Capacities...
Page 246: ...7 20 Specifications Standard arm TB290 Lifting Capacities...
Page 247: ...7 21 Specifications Lifting Capacities Standard arm TB290...
Page 248: ...7 22 Specifications Middle arm TB290 Lifting Capacities...
Page 249: ...7 23 Specifications Middle arm TB290 Lifting Capacities...
Page 250: ...7 24 Specifications Long arm TB290 Lifting Capacities...
Page 251: ...7 25 Specifications Long arm TB290 Lifting Capacities...
Page 252: ...7 26 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 253: ...7 27 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 254: ...7 28 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 255: ...7 29 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 256: ...7 30...
Page 257: ...8 1 Options...