
2-33
CONTROLS
travel leverS/pedalS
Warning
• Before operating the travel levers/
pedals, make sure that the dozer blade
is to the front of the operator’s seat.
Remember that when the dozer blade is
to the rear of the operator’s seat, the
travel levers/pedals must be operated in
the reverse direction from when it is to
the front.
• Do not rest your foot on the pedal
unless operating it for traveling. If the
pedal is accidentally stepped while
working, the machine may suddenly
move and cause serious injury or death.
Use these levers/pedals to move forward or
backward and to change directions. Fold the
pedals when not being used.
Refer to “Operating the travel levers” on
page 3-10.
leverS and pedalS
boom Swing pedal
Warning
Keep the pedal cover to the locked
position when not using the pedal.
Stepping on a pedal accidentally when it
is not locked may cause accidents.
Use this pedal to operate the boom swing.
If the 2-piece boom select switch is pressed,
the operation will change to the second
boom.
(A) .......Boom swing right/Second boom raise
(B) ......Boom swing left/Second boom lower
Refer to “Operating the boom swing” on
page 3-15.
Pedal lock
Set the pedal cover over the pedal to lock it.
Open the pedal cover from the pedal to
unlock it.
Summary of Contents for TB285
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 Safety...
Page 44: ...1 34 Safety Safety signs decals...
Page 45: ...1 35 Safety Safety signs decals...
Page 46: ...1 36 Safety Safety signs decals...
Page 47: ...1 37 Safety Safety signs decals...
Page 48: ...1 38...
Page 49: ...2 1 Controls...
Page 103: ...3 1 Operation...
Page 131: ...4 1 Transport...
Page 135: ...4 5 Transport Hoisting the machine...
Page 137: ...5 1 Maintenance...
Page 165: ...5 29 MEMO...
Page 193: ...5 57 Memo...
Page 205: ...6 1 Troubleshooting...
Page 213: ...6 9 Memo...
Page 226: ...6 22...
Page 227: ...7 1 Specifications...
Page 230: ...7 4 Specifications Machine dimensions Mono boom Machine dimensions...
Page 232: ...7 6 Specifications Machine dimensions 2 Piece boom...
Page 234: ...7 8 Specifications Operating ranges Mono boom Operating ranges...
Page 236: ...7 10 Specifications Operating ranges 2 Piece boom...
Page 238: ...7 12 Memo...
Page 240: ...7 14 Specifications Standard arm TB285 Lifting Capacities...
Page 241: ...7 15 Specifications Lifting Capacities Standard arm TB285...
Page 242: ...7 16 Specifications Middle arm TB285 Lifting Capacities...
Page 243: ...7 17 Specifications Middle arm TB285 Lifting Capacities...
Page 244: ...7 18 Specifications Long arm TB285 Lifting Capacities...
Page 245: ...7 19 Specifications Long arm TB285 Lifting Capacities...
Page 246: ...7 20 Specifications Standard arm TB290 Lifting Capacities...
Page 247: ...7 21 Specifications Lifting Capacities Standard arm TB290...
Page 248: ...7 22 Specifications Middle arm TB290 Lifting Capacities...
Page 249: ...7 23 Specifications Middle arm TB290 Lifting Capacities...
Page 250: ...7 24 Specifications Long arm TB290 Lifting Capacities...
Page 251: ...7 25 Specifications Long arm TB290 Lifting Capacities...
Page 252: ...7 26 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 253: ...7 27 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 254: ...7 28 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 255: ...7 29 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 256: ...7 30...
Page 257: ...8 1 Options...