3-5
OPERATION
warming up the engine
IMPORTANT: Avoid racing the engine until
it has warmed up.
Do not warm up the engine for a long time
(20 minutes or more). When idling is
required, occasionally place a load or run
the engine at medium speed.
1. Return the throttle controller, and then run
at a low idle with no load for 5 minutes.
Starting and Stopping the engine
Stopping the engine
IMPORTANT: Do not stop the engine
suddenly when operating with heavy
loads or at the maximum speed. Doing so
may cause the engine to overheat or
seize. Never stop running the engine
suddenly except in emergency.
1. Return the throttle controller.
2. Idle the engine for about 5 minutes to
gradually let it cool.
3. Turn the starter key to the OFF position to
stop the engine.
Summary of Contents for TB285
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 Safety...
Page 44: ...1 34 Safety Safety signs decals...
Page 45: ...1 35 Safety Safety signs decals...
Page 46: ...1 36 Safety Safety signs decals...
Page 47: ...1 37 Safety Safety signs decals...
Page 48: ...1 38...
Page 49: ...2 1 Controls...
Page 103: ...3 1 Operation...
Page 131: ...4 1 Transport...
Page 135: ...4 5 Transport Hoisting the machine...
Page 137: ...5 1 Maintenance...
Page 165: ...5 29 MEMO...
Page 193: ...5 57 Memo...
Page 205: ...6 1 Troubleshooting...
Page 213: ...6 9 Memo...
Page 226: ...6 22...
Page 227: ...7 1 Specifications...
Page 230: ...7 4 Specifications Machine dimensions Mono boom Machine dimensions...
Page 232: ...7 6 Specifications Machine dimensions 2 Piece boom...
Page 234: ...7 8 Specifications Operating ranges Mono boom Operating ranges...
Page 236: ...7 10 Specifications Operating ranges 2 Piece boom...
Page 238: ...7 12 Memo...
Page 240: ...7 14 Specifications Standard arm TB285 Lifting Capacities...
Page 241: ...7 15 Specifications Lifting Capacities Standard arm TB285...
Page 242: ...7 16 Specifications Middle arm TB285 Lifting Capacities...
Page 243: ...7 17 Specifications Middle arm TB285 Lifting Capacities...
Page 244: ...7 18 Specifications Long arm TB285 Lifting Capacities...
Page 245: ...7 19 Specifications Long arm TB285 Lifting Capacities...
Page 246: ...7 20 Specifications Standard arm TB290 Lifting Capacities...
Page 247: ...7 21 Specifications Lifting Capacities Standard arm TB290...
Page 248: ...7 22 Specifications Middle arm TB290 Lifting Capacities...
Page 249: ...7 23 Specifications Middle arm TB290 Lifting Capacities...
Page 250: ...7 24 Specifications Long arm TB290 Lifting Capacities...
Page 251: ...7 25 Specifications Long arm TB290 Lifting Capacities...
Page 252: ...7 26 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 253: ...7 27 Specifications Lifting Capacities 2 Piece boom TB285 Equipped with Extra weight...
Page 254: ...7 28 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 255: ...7 29 Specifications Lifting Capacities 2 Piece boom TB290 Equipped with Extra weight...
Page 256: ...7 30...
Page 257: ...8 1 Options...