124
Servicing Procedures
TB7100 Service Manual
© Tait Electronics Limited
October 2005
Task 2 —
Final Test
Test the base station to confirm that it is fully functional again.
The recommended tests are listed in
. It is good practice to record
the test results on a separate test sheet. A copy of the test sheet can be
supplied to the Customer as confirmation of the repair.
Task 3 —
Final
Administration
The final administration tasks are the standard workshop procedures for
updating the fault database and returning the repaired base station to the
Customer with confirmation of the repair.
If the base station could not be repaired for one of the following reasons:
■
fault not located
■
repair of fault failed
■
required repair is level-3 repair
Level-1 service centres should return the faulty base station to the nearest
ASC, and level-2 service centres should return the base station to the ISC.
Supply details of the Customer, the fault and, if applicable, the attempted
repair.
Summary of Contents for TB7100
Page 1: ...TB7100 base station Service Manual MBB 00005 01 Issue 1 October 2005...
Page 18: ...18 Mechanical Design TB7100 Service Manual Tait Electronics Limited October 2005...
Page 38: ...38 Functional Description TB7100 Service Manual Tait Electronics Limited October 2005...
Page 62: ...62 Circuit Descriptions TB7100 Service Manual Tait Electronics Limited October 2005...
Page 124: ...126 Servicing Procedures TB7100 Service Manual Tait Electronics Limited October 2005...
Page 140: ...142 Interface Fault Finding TB7100 Service Manual Tait Electronics Limited October 2005...
Page 216: ...218 Receiver Fault Finding TB7100 Service Manual Tait Electronics Limited October 2005...
Page 366: ...368 CODEC and Audio Fault Finding TB7100 Service Manual Tait Electronics Limited October 2005...