![Tait TB7100 Service Manual Download Page 50](http://html2.mh-extra.com/html/tait/tb7100/tb7100_service-manual_3297521050.webp)
50
Circuit Descriptions
TB7100 Service Manual
© Tait Electronics Limited
October 2005
Speed-up
Techniques
To reduce the change-over time between transmit and receive, part-time
speed-up techniques have been implemented. Speed-up involves changing
some resistor values while simultaneously changing the PLL IC settings.
This process is implemented in hardware under software control in
conjunction with use of the synthesized reference input. The result is a
transmit-receive settling time of less than 4.5ms. (The switching time is
measured for a frequency change equal to the first IF plus 10MHz or 1MHz,
depending on the repeater offsets used for the band. This implies a
synthesizer transmit-receive change-over plus an offset of 1 MHz or 10 MHz
in less than 4.5ms. The ramp-up and ramp-down of the transmitter, which
totals 1ms, extends this change-over time to 5.5ms.)
Summary of Contents for TB7100
Page 1: ...TB7100 base station Service Manual MBB 00005 01 Issue 1 October 2005...
Page 18: ...18 Mechanical Design TB7100 Service Manual Tait Electronics Limited October 2005...
Page 38: ...38 Functional Description TB7100 Service Manual Tait Electronics Limited October 2005...
Page 62: ...62 Circuit Descriptions TB7100 Service Manual Tait Electronics Limited October 2005...
Page 124: ...126 Servicing Procedures TB7100 Service Manual Tait Electronics Limited October 2005...
Page 140: ...142 Interface Fault Finding TB7100 Service Manual Tait Electronics Limited October 2005...
Page 216: ...218 Receiver Fault Finding TB7100 Service Manual Tait Electronics Limited October 2005...
Page 366: ...368 CODEC and Audio Fault Finding TB7100 Service Manual Tait Electronics Limited October 2005...