
TGWxE1
G a te w a y S e rie s U s e r M a n u a l
Ta d ira n Te le c o m
3 - 1
3
Installation
3.1 Tools and Meters
Screwdriver
Antistatic wrist strap
Ethernet and console port cables
Power cable
Terminals (a PC running terminal program can be used)
Universal electric meter
Multimeter
3.2 Rack Mounting
The TGWXE1 series chassis are designed to be mounted on a standard 19-inch rack with 1U height.
3.2.1 Attaching the Brackets
Place the TGWXE1 series chassis on the workbench, take two L-shape rack mounting brackets and
screws, install the brackets at the left and right sides of the equipment, as shown in the fowling figure.
The L-shape brackets are used to secure the gateway to the rack. The brackets cannot support the weight
of the equipment alone. Prior to install the TGWXE1 series chassis into rack, a supporting shelf must be
installed in place where the gateway will sit.
Figure 3-1 Installation of TGWXE1 Series L-shape Brackets
3.2.2 Mounting the Gateway
Attention should be paid during the installation:
Ensure that the rack is firmly attached to the ground and stable.
If the gateway is installed in a closed cabinet shelf, the cabinet must provide adequate air-flow so the
equipments inside can be well ventilated.
If multiple gateways are installed in a rack, it is recommended to keep at lease 1/2U space between
gateways for heat dissipation.
Summary of Contents for Aeonix TGW SIP-PRI Series
Page 7: ...Ta d ira n Te le co m vii...
Page 22: ......