33
WY04-2172E
Y-5.
Y-5.
Adjusting Procedure (Electric)
8. Over-unwinding detection switch
(main winch) (option) (CN595)
Adjust the roller assy position by the bolt Z so that
the dimension A becomes 5 mm (0.20 in), and
lock the bolt Z with a nut.
Squeeze the roller assy of switch upward further
by 1.5 mm (0.06 in) after the switch’s contact is
shifted (opened/closed).
(One turn of the bolt X makes the switch move
upward or downward by 1.5 mm (0.06 in).)
Then lock the bolt X with the nut Y.
(Note):
•
Make the head surface of the bolt X flat
beforehand.
•
Use the bolt X and the nut Y of roller assy.
9. Over-unwinding detection switch
(aux. winch) (option) (CN596)
Follow the same procedure as that in
over-unwinding detection switch (main winch)
(option) (CN595).
△
0
344-446-95000
△
0
344-446-95000
Summary of Contents for GR-300EX-3
Page 1: ......
Page 8: ...7 WA04 4880E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 27: ...14 WY02 1792E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure...
Page 98: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 27 WZ07 3762E 7 Gauge 3 343 450 35500...
Page 99: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3762E 8 Pilot 0 343 458 63000...