36
WY05-4191E
Y-6.
Y-6.
Assembly Adjustment (Crane Operation)
2. Installing and adjusting anti-buckling
bolts for telescoping cylinders
1. Connect the boom and telescoping cylinder using
the pins A and B.
2. Adjust the bolt C locked with nuts D and E so that
it can be turned by hand and the clearance (S) is
0.5mm (0.02in) or less. (Apply a thread locking
agent.)
[NOTICE]
Insert bolt
•C
of No.2 telescoping cylinder from upper
side.
△
0
342-014-10300
△
0
345-800-93500
Summary of Contents for GR-300EX-3
Page 1: ......
Page 8: ...7 WA04 4880E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 27: ...14 WY02 1792E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure...
Page 98: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 27 WZ07 3762E 7 Gauge 3 343 450 35500...
Page 99: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3762E 8 Pilot 0 343 458 63000...