9.
WARNING!
Risk of burns due to hot pipes!
Slowly open the primary connection for the heat supply flow
ð
The primary circuit fills up.
10.
Open the primary connection for the heat supply return line
11.
If installed and already connected, open the connection for the
two-zone stratifier line (Fig.
12.
To bleed the primary circuit, open the air bleed valve (Fig.
ð
The primary circuit is filled and bled.
13.
Check all bolted connections for leak-tightness.
14.
Start up the controller in accordance with the instructions for
the controller.
15.
Set the parameters for the fresh hot water station in accord-
ance with the instructions for the controller.