
AR 2000 Operator's Manual
3 9
Using Smart Swap™
The following sections explain how to attach/detach temperature modules using Smart Swap™. Note, how-
ever, that the installation and removal procedures are essentially the same for all modules.
The following modules are covered:
•
Peltier plate
•
Concentric cylinders
•
Environmental Test Chamber (ETC).
Installing the Peltier Plate
1.
Press the '
Release button
' on the control panel
as seen in Figure 5.4. A continuous green light
indicates that the attachment can be fitted.
NOTE: The release state will only
stay active for 10 seconds.
Le dévérouillage restera seulement
actif pendant 10 secondes.
2.
Fit the attachment as shown in Figure 5.5 below,
ensuring it is aligned correctly.
3.
Connect the power and fluid cables. See Figure 5.6.
4.
When the green status light goes out, the rheometer is ready for
use.
Figure 5.5
Fitting the Attachment
Figure 5.4
Press the Release Button
Figure 5.6
Connecting Power and Fluid Cables
Summary of Contents for AR 2000
Page 24: ...AR 2000 Operator s Manual 24...
Page 30: ...AR 2000 Operator s Manual 30...
Page 34: ...AR 2000 Operator s Manual 34...
Page 66: ...AR 2000 Operator s Manual 66...
Page 84: ...AR 2000 Operator s Manual 84...
Page 120: ...AR 2000 Operator s Manual 120...
Page 126: ...AR 2000 Operator s Manual 126...
Page 128: ...AR 2000 Operator s Manual 128...
Page 132: ...AR 2000 Operator s Manual 132...
Page 134: ...AR 2000 Operator s Manual 134...