background image

Standard Stall Instructions 2011 - Page 5

FRONT WALL ASSEMBLY 

Detail E

Door

Catch

Detail F 

Door header & 7" header channel optional

Minimum 2"x10" Lumber

Door Track (Round)

Door Track (Round)

One 46" Wall Braces place on inside

of wall supplied with 12' Stall Front only.

 

Stay

Roller

Post Bumper

3

/

2

"

3

/

2

"

3

/

2

"

Wall Capping (optional)

7" Header

U Channel

U-Channel

Bottom Grill

Channel

Top Grill

Channel

Rubber

Grommets

Wall bumper

Detail D

Rubber Grommet

Installation

Note

:

U-Channel 1/2"

above finished floor.

93"

from the top 

part of the 

bracket to the

floor

36 3/8"

48" Door Opening

10' Stall Front = 65" grill

12' Stall Front = 91" grill

Top door track facemount brackets

Offset track bracket

Grill Rods

3/8" X 2 1/2" Lag bolts

5/16" X 1 1/2" Lag bolts

Detail B

Door Latch

Assembly

Detail A

Door Handle

Assembly

Detail C

Trolley

Assembly

Door side

U-channel

Door bottom

channel

Door side

U-channel

Door bottom

grill channel

Door top

grill channel

Door insert

See pg. 7

Fig. 2 for detail

Door top

channel

Continuous top bracing used on free standing stall or cathedral ceilings when posts are not secured to ceilings or rafters

5/16" X 1 1/2" Lag bolts

5/16" X 1 1/2" Screws

1 1/2"

Rod

Rubber

Grommet

Lumber

Grill

Channel

Grommets

sit on top

of wood

Detail D

Rubber Grommet Installation

NOTE: Use a soft faced mallet to tap grommets into place.

Horseshoe Latch

Slide Latch

Fig. 1-B

NoTE:  use a soft mallet to tap grommets 
into place.  Grommets are really hard to 
remove if set into U-channel properly.

Detail E

Facemount bracket

Detail F

offset bracket

optional Door Latches

Stay Roller

Post bumper

Wall bumper

Round Track

End cover

Summary of Contents for Rockwood Stall Series

Page 1: ......

Page 2: ...ng as desired on center to fit building design or special needs The Grill length See c in fig A of a standard 10 stall front is 65 and 91 for a 12 stall front See Fig A However grill sections can be c...

Page 3: ...ary lumber to a length 1 4 to 3 8 less than the distance measured between the inside faces of the U channel STEP 3 Installing the lumber in the U channels 3a Slide the first board down to the bottom o...

Page 4: ...x 2 1 2 L a g S p r i n g P l a s t i c W a s h e r...

Page 5: ...all Front 91 grill Top door track facemount brackets Offset track bracket Grill Rods 3 8 X 2 1 2 Lag bolts 5 16 X 1 1 2 Lag bolts ide nnel ottom nnel p nnel nsert g 7 r detail p Continuous top bracing...

Page 6: ...ight 36 3 8 install two 7 header U channels above the top of the 46 U channel STEP 8 Place the 2 x 10 header board in the 7 U channels allowing it to extend 1 2 below the 7 U channels Use a screw at e...

Page 7: ...to pages 4 8 for the installation of the door trolley assembly and door latch completing these steps at this time will make it much easier STEP 9 Position and secure in place the two pre assembled doo...

Page 8: ...sembly in the approximate center of the door between the door side U channels STEP 10 Now insert the grill bars starting at one side until all bars are in position Then secure the center grill assembl...

Page 9: ...ch stall door post and mark a horizontal line across each post With help lift your track so that the top of each facemount bracket lines up with corresponding line Attach the brackets with 1 lag bolt...

Reviews: