
General informations
Page 6/36
Installation and commissioning instructions manual
4)
Stockage et transport
It is important to store and transport your
HYDRO’Com
®
communication gateway in its
original packaging in order to minimize risk of damage.
Furthermore, the package must be stored in an environment that is protected against
humidity and exposure to chemical products.
Environmental conditions for transport and storage:
Temperature: -10 °C to 60 °C
Air humidity: Maximum of 90% with no condensation
5)
Packaging
The apparatus is delivered without any cable other than that of primary power supply.
The communication gateway is already equipped with mounted cable glands. Additional
cables used must be adapted to the latter to comply with the degree of protection IP65. A
mounting kit is also provided.
Is included in the packaging:
✓
HYDRO’Com
®
communication gateway device,
✓
A complete fixing kit,
✓
The commissioning instruction.
6)
Warranty
The warranty is provided according to the terms of our general conditions of sale and delivery as long
as the following conditions are met:
➢
Use of the equipment according to the instructions of this notice
➢
No modifications of the equipment which may modify its behavior and no incorrect
manipulation
➢
Respect for the electrical safety conditions
Consumable material is no longer covered by the warranty when in use
Summary of Contents for HYDRO'Com HYD 7000
Page 31: ...CE compliance Page 31 36 Installation and commissioning instructions manual...
Page 32: ...Notes Page 32 36 Installation and commissioning instructions manual NOTES...
Page 33: ...Page 33 36 Installation and commissioning instructions manual...
Page 34: ...Page 34 36 Installation and commissioning instructions manual...
Page 35: ...Page 35 36 Installation and commissioning instructions manual...