2 0 6 3 6 5 R e v. 8 0 9 U F S . 1 0 . 8 0 9 . 7. U
S p a F e n g S h u i - P a g e 3 1
Owner’s Manual
SECTION 10 |
Service
1 0 . 5
|
V I B R A T O R Y B E D
Required tools:
Crosshead screwdriver, knife, wire cutters, wire strippers, wire crimper, silicone.
The vibration system has three (3) electrical motors. The motors are connected to special nests on the back of the beds.
Two (2) motors are located on the upper bed, and one (1) motor is located on the lower bed.
Two (2) electrical connections for the beds are located on the capsule bottom floor.
To remove motors from bed for replacement, follow steps below:
•
Remove the four (4) crosshead screws from the cover on the nest.
•
Use a knife to cut around the seam between the cover and the nest to remove the silicone.
•
Remove the cover from the nest.
•
Use wire cutters to cut all wires from the splices.
•
Remove four (4) screws from the motor brackets. Remove the brackets to remove the motor.
•
If replacing bed, remove cable from the nest to use in new bed.
•
Install motor in reverse order of removal procedure.
•
When installing cover, make sure to apply silicone around the edge of the cover to ensure
watertight seal to the nest.
Name
Part Number
Motor
E4000-08
Vibration bed upper
E4000-89 (w/o motor)
Vibration bed lower
E4000-91 (w/o motor)
Spa Feng Shui Manual 809.qxp:DL_SFS_806 A4 NS 9/18/08 4:17 PM Page 36