
SL-2418.MAI
4-9
04/2020
JIB LOCKOUT VALVE INSPECTION & ADJUSTMENT INSTRUCTIONS
All SwapLoader hook-lift hoists have a jib lockout valve (see illustration below) to prevent
accidental operation of the telescopic jib, while the hoist is up in a dump mode. Because the jib
lockout valve can block the flow of hydraulic oil to the jib cylinder, should the valve come out of
adjustment the telescopic jib may experience a reduction in extension or retraction speed to the
point of stalling out.
INSPECTION
When a noticeable loss in extension or retraction speed of the telescopic jib is experienced, the
first step should be to inspect the jib lockout valve and valve mount ramp to ensure that they are
adjusted properly and in good working order. The jib lockout valve is located on the inside rail
of the hoist mainframe approximately two-thirds of the way back on the driver side of the hoist
(see Drawing No. 50H72 in the Part List pages of the manual). Visually inspect the jib lockout
valve roller and the condition of the valve ramp on the hoist pivot joint without a container on
the hoist (see illustration on the next page); this is most easily performed with the hoist back in a
dismount mode. If either part shows signs of wear or damage then replace or repair as needed.
With the jib lockout valve roller and valve ramp in good condition the next step is to check that
the valve is positioned correctly with respect to the valve ramp. While looking at the roller end
of the jib lockout valve, notice that the roller moves in and out of an end cap. With the hoist
pivot joint in the down position, or horizontal to the hoist mainframe, the valve ramp should be
in contact with the jib lockout valve roller. The roller should be depressed by the valve ramp so
that 1/8” to 3/16” of the roller is exposed from the end cap (see illustrations above and on next
page).
JIB LOCKOUT VALVE ILLUSTRATION
Roller
End Cap
Spring Cap
Summary of Contents for SL-2418
Page 1: ...Model SL 2418 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...INTRODUCTION ...
Page 8: ......
Page 15: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 16: ......
Page 17: ...INSTALLATION ...
Page 18: ......
Page 31: ...SL 2418 INS 2 13 04 2020 ...
Page 41: ...SL 2418 INS 2 23 04 2020 ...
Page 42: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 57: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Page 60: ...10 05 09 ...
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ...OPERATION ...
Page 66: ......
Page 72: ......
Page 73: ...MAINTENANCE ...
Page 74: ......
Page 76: ...SL 2418 MAI 4 2 04 2020 ...
Page 90: ......
Page 91: ...PARTS LIST ...
Page 92: ......
Page 94: ...50H72 REV E SL 2418 MAINFRAME SUB ASSEMBLY 3 7 6 2 8 9 10 11 13 10 9 8 3 6 13 11 7 8 18 19 17 ...
Page 97: ...SAFETY LATCH ASSEMBLY SL 2418 50H76 REV C ...
Page 99: ......
Page 104: ......
Page 105: ...OPTIONS ...
Page 106: ......
Page 107: ......
Page 110: ...HOIST INSTALLATION KIT EHV SL 2418 52H86 ...
Page 111: ...EHV TANK CIRCUIT SL 2418 91H30 REV A ...
Page 112: ...EHV PUMP CIRCUIT 200 SERIES 91H31 ...
Page 113: ...T M U S A LTD EHV VALVE HOSE CIRCUIT SL 2418 91H33 ...
Page 114: ......
Page 115: ......