SL-2418.OPE
3-2
11/98
WARNING:
Make sure work area is clear of people and
obstacles prior to dumping or unloading
containers. SwapLoader strongly
recommends that a back up alarm be
installed on the truck chassis. The
operation of the hook hoist is that the truck
is backed up to the body to pick it up and
so there is a potential pinch point between
the body and the hook.
4.
Cycle the arm forward (left control lever forward), making sure the curved lifting bar is
securely attached to the hook. Release the brakes of the truck and steer to correctly align
the truck with the container. Watch the container rails to see that they come to rest
centered on the rear rollers. Do not extend the jib during lifting.
5.
When the container is resting on the frame, move the jib forward all the way to ensure the
container is held in the body locks (right control lever forward).
DUMPING
1.
Move the jib forward (right control forward) to ensure that the container is locked.
2.
Extend the main lift cylinders (left control backward).
CAUTION:
DO NOT RETRACT THE JIB WHILE DUMPING. Retracting the
jib during dumping may unlock the mechanical jib latches which
could allow the container to crash down onto the hoist and/or
abruptly unload.
Summary of Contents for SL-2418
Page 1: ...Model SL 2418 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...INTRODUCTION ...
Page 8: ......
Page 15: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 16: ......
Page 17: ...INSTALLATION ...
Page 18: ......
Page 31: ...SL 2418 INS 2 13 04 2020 ...
Page 41: ...SL 2418 INS 2 23 04 2020 ...
Page 42: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 57: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Page 60: ...10 05 09 ...
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ...OPERATION ...
Page 66: ......
Page 72: ......
Page 73: ...MAINTENANCE ...
Page 74: ......
Page 76: ...SL 2418 MAI 4 2 04 2020 ...
Page 90: ......
Page 91: ...PARTS LIST ...
Page 92: ......
Page 94: ...50H72 REV E SL 2418 MAINFRAME SUB ASSEMBLY 3 7 6 2 8 9 10 11 13 10 9 8 3 6 13 11 7 8 18 19 17 ...
Page 97: ...SAFETY LATCH ASSEMBLY SL 2418 50H76 REV C ...
Page 99: ......
Page 104: ......
Page 105: ...OPTIONS ...
Page 106: ......
Page 107: ......
Page 110: ...HOIST INSTALLATION KIT EHV SL 2418 52H86 ...
Page 111: ...EHV TANK CIRCUIT SL 2418 91H30 REV A ...
Page 112: ...EHV PUMP CIRCUIT 200 SERIES 91H31 ...
Page 113: ...T M U S A LTD EHV VALVE HOSE CIRCUIT SL 2418 91H33 ...
Page 114: ......
Page 115: ......