A-96.250.211 / 171121
AMI Sodium P
Installation
22
3.2. Mounting of Instrument Panel
The first part of this chapter describes the preparing and placing of
the instrument for use.
The instrument must only be installed by trained personnel.
Mount the instrument in vertical position.
For ease of operation mount it so that the display is at eye
level.
For the installation a kit containing the following installation ma
-
terial is available:
– 4 Screws 8x60 mm
– 4 Dowels
– 4 Washers 8.4/24 mm
Mounting
requirements
The instrument is only intended for indoor installation.
For dimensions see