![Swan Analytical Instruments AMI Codes-II O3 Operator'S Manual Download Page 18](http://html1.mh-extra.com/html/swan-analytical-instruments/ami-codes-ii-o3/ami-codes-ii-o3_operators-manual_1411369018.webp)
A-96.250.881 / 070622
AMI Codes-II O3
Installation
18
3.
Installation
3.1. Installation Checklist
On-site require
-
ments
AC variant: 100–240 VAC (
10%), 50/60 Hz (
5%)
DC variant: 10–36 VDC
Power consumption: 35 VA maximum.
Protective earth connection required.
Sample line with sufficient sample flow and pressure (see
).
Installation
Mount the instrument in vertical position.
Display should be at eye-level.
Mount the constant head.
Connect the sample and waste line. See
Electrical Wiring
Do not switch on the Instrument until all electrical connections have
been completed.
Connect all external devices like limit switches, current loops and
pumps.
Connect power cord. Do not switch on power yet.
Reagents
Prepare reagents. See
Refill or replace Reagents, p. 43
.
Insert the suction lances.
Power-up
Lock pump tubes.
Turn on the sample flow and wait until the flow cell is completely
filled.
Switch on power.
Adjust sample flow.
Fill or Flush Reagent System, p. 35
Instrument
Setup
Program all parameters for external devices (interface, recorders,
etc.). Program all parameters for instrument operation (limits,
alarms, measuring interval).