Chapter 5: Advanced Serverboard Setup
5-5
5-4 Processor and Heatsink Installation
Caution!
When handling the processor package, avoid placing direct pressure on the
label area. Make sure to install the system board into the chassis before you install
the CPU heatsink.
Notes
•
Always connect the power cord last, and always remove it before adding,
removing or changing any hardware components. Make sure that you install the
processor into the CPU socket before you install the CPU heatsink.
•
If you buy a CPU separately, make sure that you use an Intel-certi
fi
ed multi-
directional heatsink only.
•
When receiving a server board without a processor pre-installed, make sure that
the plastic CPU socket cap is in place and none of the socket pins are bent;
otherwise, contact your retailer immediately.
•
Refer to the Supermicro website for updates on CPU support.
•
When one CPU is installed, be sure to installed on CPU Socket 1
fi
rst.
Installing the LGA2011 Processor
1. There are two load levers on the LGA2011 socket. To open the socket cover,
fi
rst press and release the load lever labeled 'Open 1st'.
OPEN 1st
OPEN
1st
Press down on
load lever labeled
'Open 1st'.
OPEN 1st
OPEN
1st
Summary of Contents for SuperServer 4027GR-TR
Page 1: ...SUPER USER S MANUAL Revision 1 0 SuperServer 4027GR TR 4027GR TRT...
Page 5: ...v SUPERSERVER 4027GR TR TRT USER S MANUAL Notes...
Page 16: ...1 8 SUPERSERVER 4027GR TR TRT USER S MANUAL Notes...
Page 26: ...2 10 SUPERSERVER 4027GR TR TRT USER S MANUAL Notes...
Page 50: ...4 20 SUPERSERVER 4027GR TR TRT USER S MANUAL Notes...
Page 95: ...6 10 SUPERSERVER 4027GR TR TRT USER S MANUAL Notes...
Page 125: ...7 30 SUPERSERVER 4027GR TR TRT USER S MANUAL UEFI OS Boot Priorities 1st Device...
Page 129: ...7 34 SUPERSERVER 4027GR TR TRT USER S MANUAL Notes...
Page 131: ...A 2 SUPERSERVER 4027GR TR TRT USER S MANUAL Notes...