Chapter 2: Server Installation
2-9
2-6 Checking the Drive Bay Setup
Next, you should check to make sure the peripheral drives and the SATA drives have
been properly installed and all essential connections have been made.
Checking the Drives
For servicing the DVD-ROM and fl oppy drives, you will need to remove the top
•
chassis cover.
The Serial ATA disk drives can be installed and removed from the front of the
•
chassis without removing the top chassis cover.
Depending upon your system's confi guration, your system may have one or
•
two Serial ATA drives already installed. If you need to install Serial ATA drives,
please refer to the appropriate section in Chapter 6.
Checking the Airfl ow
Airfl ow is provided by two 10-cm input fans. The system component layout was
•
carefully designed to promote suffi cient airfl ow through the small 1U rackmount
space.
Also note that all power and data cables have been routed in such a way that
•
they do not block the airfl ow generated by the fans.
Providing Power
The last thing you must do is to provide input power to the system. Plug the
•
power cord from the power supply unit into a high-quality power strip that offers
protection from electrical noise and power surges.
It is recommended that you use an uninterruptible power supply (UPS).
•
Summary of Contents for Supero SUPERSERVER 6016T-T
Page 1: ...SUPER SUPERSERVER 6016T T USER S MANUAL Revision 1 0...
Page 5: ...v Preface Notes...
Page 10: ...Notes x SUPERSERVER 6016T T User s Manual...
Page 16: ...1 6 SUPERSERVER 6016T T User s Manual Notes...
Page 26: ...2 10 SUPERSERVER 6016T T User s Manual Notes...
Page 30: ...3 4 SUPERSERVER 6016T T User s Manual Notes...
Page 68: ...6 8 SUPERSERVER 6016T T User s Manual Notes...
Page 96: ...A 2 SUPERSERVER 6016T T User s Manual Notes...