2-6
AS1011M-Ni User's Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chas-
sis rails with the front of the rack rails. Slide the chassis rails into the rack rails,
keeping the pressure even on both sides (you may have to depress the locking
tabs when inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumbscrews that hold
the front of the server to the rack.
Summary of Contents for AS-1011M-Ni
Page 1: ... SUPER AS 1011M Ni USER S MANUAL 1 0a ...
Page 5: ...v Preface Notes ...
Page 10: ...x Notes AS1011M Ni User s Manual ...
Page 16: ...1 6 AS1011M Ni User s Manual Notes ...
Page 26: ...2 10 AS1011M Ni User s Manual Notes ...
Page 30: ...3 4 AS1011M Ni User s Manual Notes ...
Page 86: ...7 18 AS1011M Ni User s Manual Notes ...
Page 88: ...A 2 AS1011M Ni User s Manual Notes ...