SWTL4510 Operation Manual
41
5
OPERATION OF THE MACHINE
5.1
RUNNING-IN
A new machine must be used carefully during the first 100 working hours. It is due to ensure the
proper running-in of the components. Proper running-in is important to prolong the machine life
working with excessive load during the first operation period can cause damages to the
components.
During the running-in period (first 100 working hours), please carry out the following
indications:
•
Never use machine for excessive load.
•
After starting the engine, let it run with idle for 5 minutes.
•
Try not operating the machine at high speed.
•
Avoid abrupt starts and acceleration.
•
Carry out the maintenance .
5.2
CHECKS BEFORE OPERATION
Before any operation, carry out the checking steps . If
necessary, do the repair or maintenance before work.
Before starting engine, seat properly in the operator’s
seat and keep the seat belt fasten. Check the follows:
•
Application of restraint bar;
•
Application of the parking brake;
•
Hand accelerator is on idle position;
•
The joysticks and auxiliary controls are in neutral position;
Then turn the ignition key to the “ON” position, check the following functions:
•
The acoustic alarm;
•
The fuel level indicator;
•
Engine oil pressure;
•
Alternator warning light;
•
Preheating warning light;
•
Press the horn button on the left joystick to check its
function.
5.3
STARTING THE ENGINE
•
Only start the engine when you are seated properly in the operator’s seat.
•
Before starting the engine, make sure there are no persons or obstacles in the
surrounding area, then sound the horn and start the engine.
•
Never use starting aid fluids because they may cause explosions.