background image

3

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

1. EXPLANATION OF SYMBOLS 

AND SAFETY INSTRUCTIONS

1.1. Explanation of symbols

CAUTION! - 

Important 

recommendation 

or 

warning 

concerning 

safety 

conditions 

during installation and operation of boiler. 

DANGER! - 

fault  or  improper  use 

may  cause  injury  or  be  hazardous 

to life of humans or animals.

FIRE HAZARD!

-  fault  or  improper 

installation  and  operation  may 

cause fire.

INFORMATION-

 

Important 

information  on  the  proper 

operation of the product.

1.2.

 

Requirements to stove installation 

room.

This 

manual 

contains 

important 

information  for  the  safe  and  correct 

installation,  start-up  and  trouble-free 

operation and maintenance of the boiler.

The Pellet Stove can be used for heating 

rooms  only  in  the  manner  described  in 

this manual.

The  application  and  any  other  was  the 

area of operation is not recommended by 

the manufacturer and is not responsible 

for the occurrence of defects or failures.

Note the boiler type data on the factory 

rating  label  and  the  technical  data 

provided in chapter 10 in order to ensure 

proper operation of the product.

1.2.1.  Instructions for the installer.

During  installation  and  operation,  the 

country-specific  requirements  and 

regulations must be observed:

• Local  construction  regulations  on 

installation,  air  supply  and  exhaust 

gas  extraction  as  well  as  chimney 

connection.

• Regulations  and  norms  concerning  the 

fitting  of  the  heating  installation  with 

safety devices.

• Installation of carbon monoxide detector 

is recommended.

 Obligatory  maintenance

  –  the  pellet 

stove  must  be  cleaned  immediately 

after  each  consumption  of  certified 

pellets  between  800  kg  to  1000  kg  or 

if usage is less at least once a year. This 

maintenance must be performed by an 

authorized by BURNIT service center.  As 

long as the pellet stove is in its warranty 

period all the maintenance and service 

must  be  performed  by  the  authorized 

service  who  has  performed  the  initial 

installation.

i

Use only original BURNiT parts

WARNING! Installation and setup 

of the stove should be done 

by an authorized specialist / 

service shop and must follow the 

safety instructions and rules of 

operation.

DANGER of intoxication, 

suffocation.

Inadequate inflow of fresh air to 

the stove room may result in 

dangerous leak of exhaust gases 

during stove operation.

-

 Make sure the air inlets and 

exhaust gas outlets are not 

clogged or closed.

If faults are not remedied 

immediately, the pellet stove 

must not be operated.

- The user must be provided with 

written instructions on the fault 

and the hazard it entails.

It is mandatory to assure a backup 

power generator of corresponding 

rated power! (see  table 1)

Customer must undergo stove 

operation/maintenance training 

by authorized installer/service 

shop.

Summary of Contents for BURNIT AMBIENT V2 4G 10 Plus

Page 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL FOR AUTHORIZED INSTALLER SERVICE SHOP Pellet Stove series BURNIT AMBIENT V2 4G 8 kW 10 kW Version i0 1 2 EN...

Page 2: ...7 1 Connecting the stove to a chimney 10 7 2 Type of tubes for exhaust gas system chimney 11 7 3 Connecting of outer tube for fresh air flow 11 7 4 Connecting the pellet stove to the mains power supp...

Page 3: ...cal construction regulations on installation air supply and exhaust gas extraction as well as chimney connection Regulations and norms concerning the fitting of the heating installation with safety de...

Page 4: ...treme weather Still in case of strong wind or very chill weather the safety system of the product may automatically turn of the pellet stove In that case the end user must notify authorized service in...

Page 5: ...ystem in operation Stove casing represents a dangerous hot surface while working 1 2 3 Minimum clearances for installation and flammability of construction materials The applicable minimum clearances...

Page 6: ...feeding On the other hand the supply of air for reaching optimal combustion efficiency is easier to adjust since the fuel quantity in the combustion chamber remains constant and predictable Fuel effic...

Page 7: ...MJ kg 16 5 19 16 3 19 16 0 19 Humidity moisture 10 10 10 Dust 1 3 1 3 1 3 Mechanical durability 97 5 4 97 5 4 96 5 4 Ash 2 0 7 1 5 3 5 Melting point of ash C 1200 1100 Chlorine content 2 0 02 0 02 0...

Page 8: ...inal packaging following the instructions on the label to be protected from adverse weather conditions snow rain and dust from the shocks and other activities likely to cause damage In case of malfunc...

Page 9: ...40 m3 Ensure there is a fresh air inlet on the premises The area around and under the stove must be made of stone cement or other refractory material It is mandatory to install pellet stove on base o...

Page 10: ...anical properties the flue outlet must be sturdy and properly sealed to avoid gas leak and allow for easy access for cleaning on the inside The inner section of the flue outlet must not be greater tha...

Page 11: ...e pellet stove must receive enough fresh air flow and to be well positioned a special opening for fresh air could be done for example The flue opening area should be at least 100 cm2 If the premises h...

Page 12: ...uctions Improper cable connections may damage the regulator The device may be damaged if struck by a lightning Make sure it is unplugged during the storms To bring into exploitation the boiler and aug...

Page 13: ...13 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Scheme 2 Wiring diagram of connection of stove elements to the controller...

Page 14: ...mbient V2 4G Ignition Once you have made sure that the stove was properly installed can perform the initial start up and set all parameters Setup can be done using the screen or via PC using our dedic...

Page 15: ...tube If exhaust gas tube is layered with tar insulate well the outside of exhaust tube Tar deposition may cause fire It s mandatory at least once per heating season inspection and cleaning of exhaust...

Page 16: ...gets cool and then clean it It s mandatory to clean the ash container daily Dispose the ashes in a non combustible container with a lid 8 3 8 Cleaning of the burner Use a vacuum cleaner to clean the b...

Page 17: ...INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Cleaning the ash is through an opening above the burner After cleaning close the system Scheme 7 Cleaning the as...

Page 18: ...18 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 19: ...19 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 9 MICROPROCCESOR CONTROLLER 9 1 Explanation of Symbols...

Page 20: ...20 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 9 2 Controller Menus...

Page 21: ...21 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 22: ...22 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 23: ...23 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 24: ...5 Fan encoder fault Contact your service The Service icon blinks 007 Pressure switch is enabled Insuffi cient flue draft Check and clean the chim ney Service Icon is on 001 Display screen error Immedi...

Page 25: ...80 P 006 Auger work during ignition of fuel seconds 10 15 15 P 007 Auger pause until stable combustion seconds 10 100 100 P 008 Auger work until stable combustion seconds 10 20 20 P 010 Auger work at...

Page 26: ...ed of the heat exchanger fan at power 4 245 245 P 038 Speed of the heat exchanger fan at power 5 250 250 P 039 Speed of the heat exchanger fan in Fast heating 250 250 P 050 Temperature difference for...

Page 27: ...minutes 15 15 P 061 Duration of the self cleaning during combustion seconds 20 20 P 062 Fan speed during cleaning 180 180 P 070 Duration of the period for heating heater seconds 120 120 P 071 Service...

Page 28: ...S OF PELLET STOVE AMBIENT V2 4G 10 1 Elements of pellet stove AMBIENT V2 4G Schema 8 Elements of pelllet stove AMBIENT V2 4G 1 Controller 5 Heat resistant glass 2 Cover of pellet hopper 6 Pellet burne...

Page 29: ...N ISO 17225 2 2014 Recommended fuel kg 95 95 Weight mm 33 7 33 7 Incoming air tube diameter mm 75 80 Tube exhaust gas Chimney connection 0 180 180 Average fuel consumption per hour kg h 0 7 1 1 Burn t...

Page 30: ...f life cycle of each product its components are due to be disposed of in conformity with regulatory prescriptions Obsolete equipment shall be collected separately from other recyclable waste containin...

Page 31: ...31 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 32: ...ISO 9001 2008 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg...

Reviews: