background image

16

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

8.3.5. Cleaning the door glass

Door  glass  is  self-cleaned  during  stove 

operation. 

 

However, after several hours 

of operation, the glass may become dirty 

on the inside. The reason for this is the 

quality of the pellets and the operation of 

the exhaust system. The glass should be 

cleaned  when  the  fire  extinguished  and 

cooled.  Use  a  cotton  cloth  and  a  small 

amount of glass cleaning agent.
After  each  cleaning  check  for  distance 

of  2mm (two)  between  glass  and  upper 

edge of the door

8.3.6. Check /change of the door 

insulation rope

Rope ensures door tightness and proper 

operation of pellet stove.

Check  the  insulation  rope  periodically. 

If  any  damage  is  found,  please  contact 

an  authorized  service  to  replace  the 

insulation rope with a new one. 

The rope is not covered by warranty.

8.3.7. Removing the ash from the pellet 

stove

Check the ash container at bottom part of 

pellet stove. Turn off the stove, wait until 

gets cool and then clean it.  It`s mandatory 

to clean the ash container daily.  Dispose 

the ashes in a non-combustible container 

with a lid.

8.3.8.  Cleaning of the burner

Use a vacuum cleaner to clean the burner 

from ash   once per day. Cleaned burner 

ensures proper stove operation

Scheme 6. Cleaning of the burner

When  burner  apertures  are  filled  with 

impurities, open and clean the burner.

8.3.9. Cleaning of pellet hopper

It  is  recommended  the  periodic  hopper 

cleaning (at least once per month).

The cleaning must be done as following: 

first,  empty  the  pellet  hopper;  second, 

use a vacuum cleaner to clean the hopper.

In  case  of  lot  of  dust  and  sawdust  into 

the pellet hopper during stove operation, 

immediately  stop  operation  of  stove 

and  clean  the  pellet  hopper  and  burner 

properly.  Refuel  pellet  hopper  again.    If 

pellet hopper still has of lot of dust and 

sawdust,  replace  the  used  pellets  with 

quality ones.

When  burner  apertures  are  filled  with 

impurities, open and clean the burner.

8.3.10. Cleaning of silicone hose of 

pressure switch. 

At least once a year.

8.3.11. Cleaning the ash from the damp 

tubes.

When  using  low  quality  pellets,  we 

recommend  doing  this  once  a  month. 

Summary of Contents for BURNIT AMBIENT V2 4G 10 Plus

Page 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL FOR AUTHORIZED INSTALLER SERVICE SHOP Pellet Stove series BURNIT AMBIENT V2 4G 8 kW 10 kW Version i0 1 2 EN...

Page 2: ...7 1 Connecting the stove to a chimney 10 7 2 Type of tubes for exhaust gas system chimney 11 7 3 Connecting of outer tube for fresh air flow 11 7 4 Connecting the pellet stove to the mains power supp...

Page 3: ...cal construction regulations on installation air supply and exhaust gas extraction as well as chimney connection Regulations and norms concerning the fitting of the heating installation with safety de...

Page 4: ...treme weather Still in case of strong wind or very chill weather the safety system of the product may automatically turn of the pellet stove In that case the end user must notify authorized service in...

Page 5: ...ystem in operation Stove casing represents a dangerous hot surface while working 1 2 3 Minimum clearances for installation and flammability of construction materials The applicable minimum clearances...

Page 6: ...feeding On the other hand the supply of air for reaching optimal combustion efficiency is easier to adjust since the fuel quantity in the combustion chamber remains constant and predictable Fuel effic...

Page 7: ...MJ kg 16 5 19 16 3 19 16 0 19 Humidity moisture 10 10 10 Dust 1 3 1 3 1 3 Mechanical durability 97 5 4 97 5 4 96 5 4 Ash 2 0 7 1 5 3 5 Melting point of ash C 1200 1100 Chlorine content 2 0 02 0 02 0...

Page 8: ...inal packaging following the instructions on the label to be protected from adverse weather conditions snow rain and dust from the shocks and other activities likely to cause damage In case of malfunc...

Page 9: ...40 m3 Ensure there is a fresh air inlet on the premises The area around and under the stove must be made of stone cement or other refractory material It is mandatory to install pellet stove on base o...

Page 10: ...anical properties the flue outlet must be sturdy and properly sealed to avoid gas leak and allow for easy access for cleaning on the inside The inner section of the flue outlet must not be greater tha...

Page 11: ...e pellet stove must receive enough fresh air flow and to be well positioned a special opening for fresh air could be done for example The flue opening area should be at least 100 cm2 If the premises h...

Page 12: ...uctions Improper cable connections may damage the regulator The device may be damaged if struck by a lightning Make sure it is unplugged during the storms To bring into exploitation the boiler and aug...

Page 13: ...13 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Scheme 2 Wiring diagram of connection of stove elements to the controller...

Page 14: ...mbient V2 4G Ignition Once you have made sure that the stove was properly installed can perform the initial start up and set all parameters Setup can be done using the screen or via PC using our dedic...

Page 15: ...tube If exhaust gas tube is layered with tar insulate well the outside of exhaust tube Tar deposition may cause fire It s mandatory at least once per heating season inspection and cleaning of exhaust...

Page 16: ...gets cool and then clean it It s mandatory to clean the ash container daily Dispose the ashes in a non combustible container with a lid 8 3 8 Cleaning of the burner Use a vacuum cleaner to clean the b...

Page 17: ...INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Cleaning the ash is through an opening above the burner After cleaning close the system Scheme 7 Cleaning the as...

Page 18: ...18 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 19: ...19 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 9 MICROPROCCESOR CONTROLLER 9 1 Explanation of Symbols...

Page 20: ...20 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 9 2 Controller Menus...

Page 21: ...21 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 22: ...22 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 23: ...23 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 24: ...5 Fan encoder fault Contact your service The Service icon blinks 007 Pressure switch is enabled Insuffi cient flue draft Check and clean the chim ney Service Icon is on 001 Display screen error Immedi...

Page 25: ...80 P 006 Auger work during ignition of fuel seconds 10 15 15 P 007 Auger pause until stable combustion seconds 10 100 100 P 008 Auger work until stable combustion seconds 10 20 20 P 010 Auger work at...

Page 26: ...ed of the heat exchanger fan at power 4 245 245 P 038 Speed of the heat exchanger fan at power 5 250 250 P 039 Speed of the heat exchanger fan in Fast heating 250 250 P 050 Temperature difference for...

Page 27: ...minutes 15 15 P 061 Duration of the self cleaning during combustion seconds 20 20 P 062 Fan speed during cleaning 180 180 P 070 Duration of the period for heating heater seconds 120 120 P 071 Service...

Page 28: ...S OF PELLET STOVE AMBIENT V2 4G 10 1 Elements of pellet stove AMBIENT V2 4G Schema 8 Elements of pelllet stove AMBIENT V2 4G 1 Controller 5 Heat resistant glass 2 Cover of pellet hopper 6 Pellet burne...

Page 29: ...N ISO 17225 2 2014 Recommended fuel kg 95 95 Weight mm 33 7 33 7 Incoming air tube diameter mm 75 80 Tube exhaust gas Chimney connection 0 180 180 Average fuel consumption per hour kg h 0 7 1 1 Burn t...

Page 30: ...f life cycle of each product its components are due to be disposed of in conformity with regulatory prescriptions Obsolete equipment shall be collected separately from other recyclable waste containin...

Page 31: ...31 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 32: ...ISO 9001 2008 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg...

Reviews: