background image

11

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

i

Data in the tables are for 

indicative purposes.

Draught depends on the diameter,  

height, uneven sections along the 

chimney surface and differences 

in temperature of combustion 

products and outside air. We 

recommend that you use chimney 

fitted with flue terminal. Heating 

specialist must calculate the 

precise sizing of the chimney.

We recommend that the stove be installed 

as  close  as  possible  to  the  system’s 

exhaust gas extraction system (the flue). 

The  maximum  permitted  length  of  duct 

pipe between the stove and the flue is 3 

m, whereas no horizontal section longer 

than 0.5 m is allowed.

7.2. Type of tubes for exhaust gas system 

(chimney)

The tubes must be solid,  smooth inside, 

mad of steel and must be accompanied by 

silicone gaskets. 

The  diameter  of  tubes  long  up  to  3  m. 

must  be  80  mm.  The  diameter  of  tubes 

long  more  than  3  m.  must  be  minimum 

100 mm. as it is necessary to obtain the 

required draught of the chimney.

Do not connect the exhaust gas 

system to a chimney in which 

already is connected another 

stove, boiler or ventilation 

system!

7.3.  Connecting of outer tube for fresh 

air flow

For  proper  functioning  and  distribution 

of the temperature the pellet stove must 

receive  enough  fresh  air  flow  and  to  be 

well  positioned  (a  special  opening  for 

fresh air could be done for example).

The  flue  opening  area  should  be  at 

least  100  cm2.  If  the  premises  has  an 

air  outflow/suction  system  installed,  a 

relevant fresh air inflow must be provided 

for. 

This may be carried out through providing 

continuous  ventilation  from  another 

premises  with  no  fireplace  or  other  air-

intaking system in operation. 

Such  premises  exclude  bedrooms, 

bathrooms,  or  premises  with  increased 

fire  hazard,  such  as  garages,  basements, 

or flammable material storage rooms.

If such room has already another heating 

appliance  installed  (e.g.  a  fireplace, 

a  heater  etc.)  or  another  source  of 

hazardous gases, then the new stove must 

be provided with an additional source of 

fresh air from outdoors. 

The  same  provision  goes  for  any 

subsequently added heating devices.

Example: Connection of tube for fresh air 

flow directly from the outside

For proper functioning of the pellet stove 

it is recommended to make a direct 

connection from outside the room with 

steel pipe 80 мм. with silicon gasket. The 

part of the tube that goes outside the 

room must be situated downwards 90° - in 

this way a protection against wind, water, 

etc. is achieved.

Upon such direct connection the following 

distances should be observed:

- 1.5 m from the floor

- 1.5 m from horizontal ducting section

- 0.3 m from doors and windows, whereas 

pipes must run above them

- 2.0 m from the exhaust gas system.

Summary of Contents for BURNIT AMBIENT V2 4G 10 Plus

Page 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL FOR AUTHORIZED INSTALLER SERVICE SHOP Pellet Stove series BURNIT AMBIENT V2 4G 8 kW 10 kW Version i0 1 2 EN...

Page 2: ...7 1 Connecting the stove to a chimney 10 7 2 Type of tubes for exhaust gas system chimney 11 7 3 Connecting of outer tube for fresh air flow 11 7 4 Connecting the pellet stove to the mains power supp...

Page 3: ...cal construction regulations on installation air supply and exhaust gas extraction as well as chimney connection Regulations and norms concerning the fitting of the heating installation with safety de...

Page 4: ...treme weather Still in case of strong wind or very chill weather the safety system of the product may automatically turn of the pellet stove In that case the end user must notify authorized service in...

Page 5: ...ystem in operation Stove casing represents a dangerous hot surface while working 1 2 3 Minimum clearances for installation and flammability of construction materials The applicable minimum clearances...

Page 6: ...feeding On the other hand the supply of air for reaching optimal combustion efficiency is easier to adjust since the fuel quantity in the combustion chamber remains constant and predictable Fuel effic...

Page 7: ...MJ kg 16 5 19 16 3 19 16 0 19 Humidity moisture 10 10 10 Dust 1 3 1 3 1 3 Mechanical durability 97 5 4 97 5 4 96 5 4 Ash 2 0 7 1 5 3 5 Melting point of ash C 1200 1100 Chlorine content 2 0 02 0 02 0...

Page 8: ...inal packaging following the instructions on the label to be protected from adverse weather conditions snow rain and dust from the shocks and other activities likely to cause damage In case of malfunc...

Page 9: ...40 m3 Ensure there is a fresh air inlet on the premises The area around and under the stove must be made of stone cement or other refractory material It is mandatory to install pellet stove on base o...

Page 10: ...anical properties the flue outlet must be sturdy and properly sealed to avoid gas leak and allow for easy access for cleaning on the inside The inner section of the flue outlet must not be greater tha...

Page 11: ...e pellet stove must receive enough fresh air flow and to be well positioned a special opening for fresh air could be done for example The flue opening area should be at least 100 cm2 If the premises h...

Page 12: ...uctions Improper cable connections may damage the regulator The device may be damaged if struck by a lightning Make sure it is unplugged during the storms To bring into exploitation the boiler and aug...

Page 13: ...13 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Scheme 2 Wiring diagram of connection of stove elements to the controller...

Page 14: ...mbient V2 4G Ignition Once you have made sure that the stove was properly installed can perform the initial start up and set all parameters Setup can be done using the screen or via PC using our dedic...

Page 15: ...tube If exhaust gas tube is layered with tar insulate well the outside of exhaust tube Tar deposition may cause fire It s mandatory at least once per heating season inspection and cleaning of exhaust...

Page 16: ...gets cool and then clean it It s mandatory to clean the ash container daily Dispose the ashes in a non combustible container with a lid 8 3 8 Cleaning of the burner Use a vacuum cleaner to clean the b...

Page 17: ...INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Cleaning the ash is through an opening above the burner After cleaning close the system Scheme 7 Cleaning the as...

Page 18: ...18 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 19: ...19 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 9 MICROPROCCESOR CONTROLLER 9 1 Explanation of Symbols...

Page 20: ...20 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 9 2 Controller Menus...

Page 21: ...21 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 22: ...22 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 23: ...23 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 24: ...5 Fan encoder fault Contact your service The Service icon blinks 007 Pressure switch is enabled Insuffi cient flue draft Check and clean the chim ney Service Icon is on 001 Display screen error Immedi...

Page 25: ...80 P 006 Auger work during ignition of fuel seconds 10 15 15 P 007 Auger pause until stable combustion seconds 10 100 100 P 008 Auger work until stable combustion seconds 10 20 20 P 010 Auger work at...

Page 26: ...ed of the heat exchanger fan at power 4 245 245 P 038 Speed of the heat exchanger fan at power 5 250 250 P 039 Speed of the heat exchanger fan in Fast heating 250 250 P 050 Temperature difference for...

Page 27: ...minutes 15 15 P 061 Duration of the self cleaning during combustion seconds 20 20 P 062 Fan speed during cleaning 180 180 P 070 Duration of the period for heating heater seconds 120 120 P 071 Service...

Page 28: ...S OF PELLET STOVE AMBIENT V2 4G 10 1 Elements of pellet stove AMBIENT V2 4G Schema 8 Elements of pelllet stove AMBIENT V2 4G 1 Controller 5 Heat resistant glass 2 Cover of pellet hopper 6 Pellet burne...

Page 29: ...N ISO 17225 2 2014 Recommended fuel kg 95 95 Weight mm 33 7 33 7 Incoming air tube diameter mm 75 80 Tube exhaust gas Chimney connection 0 180 180 Average fuel consumption per hour kg h 0 7 1 1 Burn t...

Page 30: ...f life cycle of each product its components are due to be disposed of in conformity with regulatory prescriptions Obsolete equipment shall be collected separately from other recyclable waste containin...

Page 31: ...31 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 32: ...ISO 9001 2008 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg...

Reviews: