background image

15

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

8.3. Requirements for the cleaning and 

maintenance of Ambient V2 4G stove.

IMPORTANT! Do not use acid-

containing detergents or 

flammable liquids for cleaning.

Caution! Hot surfaces.

Before cleaning the boiler, make 

sure the fire in it has died out and 

the boiler has cooled down.

Regularly  clean  the  pellet  stove  and  the 

flue gas system. This will ensure efficient 

operation of the stove.

8.3.1. Inspection and cleaning of fresh air 

system 

It`s  mandatory  to  inspect  the  fresh  air 

system  at  the  beginning  of  each  heating 

season.    Any  malfunctioning  must  be 

repaired.

8.3.2. Inspection and cleaning of exhaust 

gas system

It`s mandatory to inspect the exhaust gas 

system  at  the  beginning  of  each  heating 

season.  If the electric cable is damaged 

should be replaced with a new one.
TAR  is  liquid  formed  during    poor 

combustion  and  low  temperature  in 

exhaust gas tube.  If exhaust gas tube is 

layered with tar, insulate well the outside 

of exhaust tube. Tar deposition may cause 

fire.    It`s  mandatory  at  least  once  per 

heating season inspection and cleaning of 

exhaust gas system.

8.3.3. Cleaning and maintenance of the 

pellet stove.

Cleaning  and  maintenance  of  the  pellet 

stove must be performed regularly.
-  Clean the stove outer surface, glass, rope 

on the door, ash container periodically.
-  Clean the pellet burner daily.
-  Clean the pellet hopper once per month.
-  It‘s mandatory to clean stove totally for 

burned pellet amount of 800 kg to 1000 

kg or once per year.

When making routine check the 

authorized service must do as following:

•   Cleaning  the fan;
•      Cleaning  all  the  inaccessible  places 

burner;

•   Complete check  of the ignition system 

and the pellet loading system;

•   Complete check of the condition of the 

insulations  ropes  on  the  door  and  to 

change it if needed.

•  Dismounting  and  cleaning  the 

T-connection  of  the  exhaust  gases 

system

•  Complete check of all the electrical 

parameters;

•    Issuing  an  inspection  report  for  the 

actions performed;

8.3.4. Cleaning the outer surface of pellet 

stove

Use  soft  cloth  and  neutral  cleaning 

detergents.

Summary of Contents for BURNIT AMBIENT V2 4G 10 Plus

Page 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL FOR AUTHORIZED INSTALLER SERVICE SHOP Pellet Stove series BURNIT AMBIENT V2 4G 8 kW 10 kW Version i0 1 2 EN...

Page 2: ...7 1 Connecting the stove to a chimney 10 7 2 Type of tubes for exhaust gas system chimney 11 7 3 Connecting of outer tube for fresh air flow 11 7 4 Connecting the pellet stove to the mains power supp...

Page 3: ...cal construction regulations on installation air supply and exhaust gas extraction as well as chimney connection Regulations and norms concerning the fitting of the heating installation with safety de...

Page 4: ...treme weather Still in case of strong wind or very chill weather the safety system of the product may automatically turn of the pellet stove In that case the end user must notify authorized service in...

Page 5: ...ystem in operation Stove casing represents a dangerous hot surface while working 1 2 3 Minimum clearances for installation and flammability of construction materials The applicable minimum clearances...

Page 6: ...feeding On the other hand the supply of air for reaching optimal combustion efficiency is easier to adjust since the fuel quantity in the combustion chamber remains constant and predictable Fuel effic...

Page 7: ...MJ kg 16 5 19 16 3 19 16 0 19 Humidity moisture 10 10 10 Dust 1 3 1 3 1 3 Mechanical durability 97 5 4 97 5 4 96 5 4 Ash 2 0 7 1 5 3 5 Melting point of ash C 1200 1100 Chlorine content 2 0 02 0 02 0...

Page 8: ...inal packaging following the instructions on the label to be protected from adverse weather conditions snow rain and dust from the shocks and other activities likely to cause damage In case of malfunc...

Page 9: ...40 m3 Ensure there is a fresh air inlet on the premises The area around and under the stove must be made of stone cement or other refractory material It is mandatory to install pellet stove on base o...

Page 10: ...anical properties the flue outlet must be sturdy and properly sealed to avoid gas leak and allow for easy access for cleaning on the inside The inner section of the flue outlet must not be greater tha...

Page 11: ...e pellet stove must receive enough fresh air flow and to be well positioned a special opening for fresh air could be done for example The flue opening area should be at least 100 cm2 If the premises h...

Page 12: ...uctions Improper cable connections may damage the regulator The device may be damaged if struck by a lightning Make sure it is unplugged during the storms To bring into exploitation the boiler and aug...

Page 13: ...13 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Scheme 2 Wiring diagram of connection of stove elements to the controller...

Page 14: ...mbient V2 4G Ignition Once you have made sure that the stove was properly installed can perform the initial start up and set all parameters Setup can be done using the screen or via PC using our dedic...

Page 15: ...tube If exhaust gas tube is layered with tar insulate well the outside of exhaust tube Tar deposition may cause fire It s mandatory at least once per heating season inspection and cleaning of exhaust...

Page 16: ...gets cool and then clean it It s mandatory to clean the ash container daily Dispose the ashes in a non combustible container with a lid 8 3 8 Cleaning of the burner Use a vacuum cleaner to clean the b...

Page 17: ...INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Cleaning the ash is through an opening above the burner After cleaning close the system Scheme 7 Cleaning the as...

Page 18: ...18 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 19: ...19 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 9 MICROPROCCESOR CONTROLLER 9 1 Explanation of Symbols...

Page 20: ...20 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 9 2 Controller Menus...

Page 21: ...21 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 22: ...22 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 23: ...23 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 24: ...5 Fan encoder fault Contact your service The Service icon blinks 007 Pressure switch is enabled Insuffi cient flue draft Check and clean the chim ney Service Icon is on 001 Display screen error Immedi...

Page 25: ...80 P 006 Auger work during ignition of fuel seconds 10 15 15 P 007 Auger pause until stable combustion seconds 10 100 100 P 008 Auger work until stable combustion seconds 10 20 20 P 010 Auger work at...

Page 26: ...ed of the heat exchanger fan at power 4 245 245 P 038 Speed of the heat exchanger fan at power 5 250 250 P 039 Speed of the heat exchanger fan in Fast heating 250 250 P 050 Temperature difference for...

Page 27: ...minutes 15 15 P 061 Duration of the self cleaning during combustion seconds 20 20 P 062 Fan speed during cleaning 180 180 P 070 Duration of the period for heating heater seconds 120 120 P 071 Service...

Page 28: ...S OF PELLET STOVE AMBIENT V2 4G 10 1 Elements of pellet stove AMBIENT V2 4G Schema 8 Elements of pelllet stove AMBIENT V2 4G 1 Controller 5 Heat resistant glass 2 Cover of pellet hopper 6 Pellet burne...

Page 29: ...N ISO 17225 2 2014 Recommended fuel kg 95 95 Weight mm 33 7 33 7 Incoming air tube diameter mm 75 80 Tube exhaust gas Chimney connection 0 180 180 Average fuel consumption per hour kg h 0 7 1 1 Burn t...

Page 30: ...f life cycle of each product its components are due to be disposed of in conformity with regulatory prescriptions Obsolete equipment shall be collected separately from other recyclable waste containin...

Page 31: ...31 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Page 32: ...ISO 9001 2008 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg...

Reviews: