2
1
4
6
CHAPTER FIVE
BATTERIES & BATTERY BOX
ST PS
Sunrise Training and Education Programmes
Batteries & Battery Box
Checking the Wiring
3
5
5:5
The Multimeter should be set to read RESISTANCE for the following tasks.
Place one probe into pin 3 on the charging socket.
Place the other probe second from top left on the 8
pin plug as shown. Meter reads close to Zero.
For good continuity (reading is OK) the meter
should read close to Zero as above.
For no continuity or open circuit (bad reading) the
meter will read similar to above. In this case, check
for broken wires etc.
Place one probe top right of the 4 pin socket & the
other second from top right on the 8 pin socket.
Meter reads close to Zero.
Place one probe bottom left of the 4 pin socket &
the other bottom right on the 8 pin socket. Meter
reads close to Zero.