System Manual
5 Mechanical Installation
21
5.2
Hoisting the MV Station
5.2.1
Safety Precautions
Observe the safety operating rules of the crane at all times.
Standing within 5 to 10 meters of the hoisting areas is strictly forbidden!
Anybody standing under the boom or MV Station is strictly forbidden in the
whole hoisting process.
The hoisting work must be stopped in violent weather days. For example, in
strong wind, heavy rain, or thick fog conditions.
Please carefully observe the following items:
All safety requirements must be met.
A professional instructor is needed in the whole hoisting process.
All the slings used must have the load-bearing capacity of at least 30t.
The crane should have sufficient arm length and radius of gyration.
All the connection point must be firmly connected.
The length of the slings can be adjusted appropriately according to on-site conditions.
Transport the MV Station in a level, smooth and steady way.
Transport the MV Station by connecting the four top corner fittings.
Some accessories may be needed to ensure the hoisting safety.
The following figure illustrates the hoisting operations. Circle A describes the work areas of
the crane. Anybody standing inside the circle B is forbidden for safety considerations.
Crane
M
V
S
ta
ti
o
n
B
A
M
V
S
ta
ti
o
n
Fig. 5-1
Hoisting the MV Station