20
5
Mechanical Installation
Respect all local standards and requirements during mechanical installation.
5.1
Transport
All devices are installed inside the MV Station before delivery. The MV Station should be
transported as a whole. Transport the MV Station by crane with sufficient load capacity.
The MV Station is delivered to the user by a forwarding company. After unloading, the MV
Station will be transported to the installation site by the plant staff.
Local standards and regulations on the container transport and loading &
unloading, especially those safety instructions, should be observed at all times.
All the accessory appliances used during transport should be maintained
beforehand.
The transport of the MV Station must be done by qualified personnel. Qualified
means the operators must have relevant training experience, especially those
safety-related ones.
Keep in mind the dimensions and total weight of the MV Station at all times.
Ensure that the following requirements are met:
All the doors are locked.
Choose appropriate crane or hoist to transport the MV Station. The crane or hoist must
be sufficient to bear the weight of the MV Station.
An additional traction vehicle may be needed when the road has a gradient.
Anything, which may hinder the transport, like trees, cables (or similar), should be
removed.
If possible, choose fine weather days to transport the MV Station.
Warning signs or barriers must be posted near the transport areas to avoid accidental
injuries.
Additionally, the following should be met when the MV Station is placed on the ground:
Place the MV Station carefully and gently. Do not pull or push the MV Station on any
surface.
The place should be firm and flat, has good drainage and has no obstacles or
outshoots. The MV Station should be placed and supported by the four feet.