
Chapter 2
Installation and Configuration
27
2. Continue with initial software setup tasks.
Refer to
“Setting Up the ILOM Software” on page 12
▼
To Power on Main Power for All Server
Components
1. Verify that standby power is on.
In standby power mode, the OK LED on the front panel flashes. See
2. Use a pointed object or stylus to press and release the recessed Power button on
the server front panel.
When main power is applied to the full server, the Power/OK LED above the Power
button lights and remains lit.
▼
To Shut Down Main Power Mode
To power off the server from main power mode, use one of the following two methods:
■
Graceful shutdown.
Use a pointed object or other stylus to press and release the
Power button on the front panel. This causes Advanced Configuration and Power
Interface (ACPI) enabled operating systems to perform an orderly shutdown of
the operating system. Servers not running ACPI-enabled operating systems will
shut down to standby power mode immediately.
■
Emergency shutdown.
Press and hold the Power button for four seconds to force
main power off and enter standby power mode.
When main power is off, the Power/OK LED on the front panel will begin flashing,
indicating that the server is in standby power mode.
Note –
To power off the server completely, you must either remove the server
module from the chassis or disconnect the AC power cords from the back panel of
the chassis.
Summary of Contents for BLADE T6320
Page 1: ...Sun Blade T6320 Server Module Installation Guide Part No 820 2384 11 April 2010 Revision A...
Page 4: ......
Page 10: ...x Sun Blade T6320 Server Module Installation Guide April 2010...
Page 18: ...8 Sun Blade T6320 Server Module Installation Guide April 2010...
Page 40: ...30 Sun Blade T6320 Server Module Installation Guide April 2010...