■
The distance to the front cabinet door, providing clearance depth in front of the front
mounting plane, is at least 1 in (25.4 mm).
■
The distance to the back cabinet door, providing clearance depth behind the front mounting
plane, is at least 31.5 in (800 mm) with the cable management assembly, or 27.5 in (700 mm)
without the cable management assembly.
■
The distance between structural supports and cable troughs, providing clearance width
between the front and back mounting planes, is at least 18 in (456 mm).
For cabinet installation, you will need a total distance of at least 15 ft/4.5 m for safe maneuvering
when you roll the cabinet off the shipping pallet.
Caution
- Moving the 7700 cabinet off the
pallet requires at least three people.
Controller, Cabinet and Disk Shelf Installation Tasks
The following sections provide installation tasks with enumerated steps.
■
7x20 controller installation tasks
■
Sun Disk Shelf installation tasks
■
7700 cabinet planning and installation tasks
■
7x10 controller installation tasks
7x20 Controllers
7x20 Controller Installation Tasks
This section provides enumerated steps for installing the Sun ZFS Storage 7120, 7320 or 7420
controllers into a rack using the rail assembly in the rack mount kit. Note that if your rack
mount kit shipped with installation instructions, use those instructions instead.
Observe the following cautions:
■
Always load equipment into a rack from the bottom up so that it will not become top-heavy
and tip over. Deploy the anti-tip bar to the prevent the rack from tipping during equipment
installation.
■
Ensure that the temperature in the rack will not exceed the controller's maximum ambient
rated temperatures. Consider the total airflow requirements of all equipment installed in the
rack to ensure that the equipment is operated within its specified temperature range.
7x20 Controllers
Chapter 2 • Installation
15
Summary of Contents for ZFS
Page 1: ...Sun ZFS Storage 7x20 Appliance Installation Guide Part No 821 1673 11 Rev A November 2010 ...
Page 5: ...Glossary 103 Index 107 Contents 5 ...
Page 6: ...6 ...
Page 8: ...8 ...
Page 52: ...52 ...
Page 64: ...7420 Cabling pt 1 Sun ZFS Storage 7x20 Appliance Installation Guide November 2010 64 ...
Page 82: ...7420 Cluster Cabling pt 2 Sun ZFS Storage 7x20 Appliance Installation Guide November 2010 82 ...
Page 102: ...102 ...
Page 106: ...106 ...
Page 108: ...108 ...