
2-22
SPARCserver 1000 System Board Manual—October 1994
2
6. Tilt the SIMM upright to lock it in place.
The locking tabs should automatically lock around the SIMM.
Note – The SIMM should require very little insertion force. If the SIMM doesn’t
seat properly, or if a replacement SIMM is made by a different manufacturer,
the replacement SIMM may be backward; verify the SIMM alignment holes
and notch exactly match the corresponding parts of the socket.
7. Lock any SIMMs that were loosened during the installation procedure.
2.6.3 NVSIMMs
Before installing NVSIMMs you must first activate the battery to ensure data
retention. To activate the battery you must locate the jumper on the right side
of the NVSIMM. Refer to Figure 2-18. Move the jumper to the battery ON
position.
Figure 2-18 NVSIMM Jumper Locations
Caution – After you turn the battery ON do not move or remove the jumper.
Moving the jumper will cause the lose of any data contained in the NVSIMM.
1
34
35
68
Battery
Jumper
Battery ON
Battery OFF
!
Summary of Contents for SunSwift SPARCserver 1000
Page 6: ...vi SPARCserver 1000 System Board Manual October 1994 ...
Page 10: ...x SPARCserver 1000 System Board Manual October 1994 ...
Page 14: ...xiv SPARCserver 1000 System Board Manual October 1994 ...
Page 20: ...1 6 SPARCserver 1000 System Board Manual October 1994 1 ...
Page 68: ...C 8 SPARCserver 1000 System Board Manual October 1994 C ...
Page 72: ...Index 4 SPARCserver 1000 System Board Manual October 1994 ...
Page 74: ...SPARCserver 1000 System Board Manual October 1994 ...