Sun StorEdge™ L25 Tape Library and Sun StorEdge™ L100 Tape Library Installation Guide
Document 6423015-01, Ver. 1, Rel. 0
June 2002
Installing a Rack Mount Library
9
Figure 3 Securing the
Shelf in the Half Position
4
Install the front shelf clamps (see
):
a
Position a front shelf clamp (PN 217397) on the front left rack
rail.
b
Secure the shelf clamp to the rack rail using two countersink
screws (PN YS40986).
c
Repeat these steps to install a shelf clamp on the front right
rack rail.