Sun StorEdge™ L25 Tape Library and Sun StorEdge™ L100 Tape Library Installation Guide
Document 6423015-01, Ver. 1, Rel. 0
June 2002
32
Connecting the Library to AC Power
L100 Power
Requirements
0
To connect the L100 library to AC power:
1
Referring to
, select appropriate AC distribution unit(s) for
your library configuration and input voltage.
2
Using one of the short AC power cables provided in the accessory
kit, connect the top power supply to the AC distribution panel on
the back of the library (see
3
Using the remaining short AC power cable, connect the bottom
power supply to the AC distribution panel (see
).
4
Connect the power cable (provided in the accessories kit) to the
power inlet on the back of the library (see
) and to the wall
outlet or AC distribution unit.
Figure 24 Power Inlet
Warning:
AC distribution units (power strips) must be certified
for safety by an agency acceptable to the country of
use. For use in the United States and Canada,
distribution units must be UL listed and CSA
certified. For use in Europe, distribution units must
be CE marked. National certifications for other
countries depend on local requirements.
Connect these
using a short
power cable
Connect this inlet
to the wall outlet
or AC distribution
unit
Connect these
using a short
power cable