
b.
If the test is successful, install a new hose and repeat the leak
test to check for other leaks.
c.
If the test still fails, continue with step 4.
4.
Pinch off the tube connected to the gas filter with a small vise grip or
needle nose style pliers. Repeat the leak check.
a.
If the test fails, the problem is either the hose or there is an
internal leak in the analyser. Contact your SUN Service
Representative for repair service.
b.
if the test is successful, a gas filter leak is indicated. Replace
the gas filter and repeat the leak test.
c.
If the test is successful, the leak is repaired.
d.
If the test fails, contact your SUN Service Representative for
repair service.
9.6.4 Test Leads
Inspect all test leads weekly for any cuts, kinks or abrasions and
replace any faulty pick-ups or leads.
When routing leads across an engine, ensure that they do not
come into contact with any moving engine components or hot
surfaces such as exhaust manifolds etc.
Trigger clamps should be kept free from oil, grease and other
contaminants and should be cleaned to minimise false triggering
and, therefore, false measurements.
9.6.5 O2 Cell
The unit will indicate when the O2 cell requires replacing by
showing the “Pre-warning change O
2
cell” and “Change O
2
cell”
warning messages. Refer to
.5: „Check and/or Install the O2
for further information.
65
C H A P T E R 10
Summary of Contents for DGA 5000
Page 1: ...EMISSIONS DIAGNOSTIC PLATFORM Operator s Manual HIGH TECH SECURES YOUR FUTURE...
Page 2: ......
Page 5: ......
Page 9: ...vi...
Page 13: ...4 C H A P T E R 1...
Page 15: ...6 C H A P T E R 2...
Page 24: ...15 C H A P T E R 4...
Page 46: ...37 C H A P T E R 7...
Page 81: ...C H A P T E R 10 MAINTENANCE 72...
Page 84: ......