
The Leak Check (Vacuum) screen will be displayed instructing the
operator to block the sample probe inlet.
Figure 9-1
Leak Check (Vacuum) Initialization
•
Block the probe inlet using the Probe Sealing Tool (p/n 7009E9317-
46) supplied with the unit.
The screen will indicate that the unit has entered a stabilisation period
during which the pump will build up a vacuum in the gas analyser
pneumatic circuit. The current vacuum will be displayed in mBar and a
status bar will indicate a 20 second countdown.
At the end of the stabilisation period, the pump will cut out and the unit
will measure the vacuum decay over a further 20 second period. During
this measurement period the current vacuum and the vacuum decay will
be displayed. A status bar will show a 20 second countdown.
53
C H A P T E R 10
Summary of Contents for DGA 5000
Page 1: ...EMISSIONS DIAGNOSTIC PLATFORM Operator s Manual HIGH TECH SECURES YOUR FUTURE...
Page 2: ......
Page 5: ......
Page 9: ...vi...
Page 13: ...4 C H A P T E R 1...
Page 15: ...6 C H A P T E R 2...
Page 24: ...15 C H A P T E R 4...
Page 46: ...37 C H A P T E R 7...
Page 81: ...C H A P T E R 10 MAINTENANCE 72...
Page 84: ......