
Figure 9-9
O2 Sensor Status Check - Result
Note:
Once
“Continue” is pressed the installation procedure must be
completed even if a new cell is not installed. If the old cell remains in situ
the software will see the existing cell as a new cell and will require that
the auto-calibration referred to below be performed.
The screen will show “Change O
2
cell” and ask the operator to press
“Continue” in order to proceed with the installation of a new cell.
To install a new cell:
•
Remove the O
2
/NO cell cover plate on the rear panel of the gas
module (if applicable).
•
Remove the connector from the existing O
2
cell and turn the cell
anti-clockwise to remove it.
•
Install the new cell and replace the connector.
•
Press
“Continue”.
The unit will determine the output voltage of the new cell. If the new
cell is acceptable the screen will prompt the operator to press
“Continue” to initiate an auto-calibration.
•
Press “Continue” to initiate the auto-calibration
61
C H A P T E R 10
Summary of Contents for DGA 5000
Page 1: ...EMISSIONS DIAGNOSTIC PLATFORM Operator s Manual HIGH TECH SECURES YOUR FUTURE...
Page 2: ......
Page 5: ......
Page 9: ...vi...
Page 13: ...4 C H A P T E R 1...
Page 15: ...6 C H A P T E R 2...
Page 24: ...15 C H A P T E R 4...
Page 46: ...37 C H A P T E R 7...
Page 81: ...C H A P T E R 10 MAINTENANCE 72...
Page 84: ......