Page 11
F Greenhouse Vent Assembly
& Roof Completion
Profile
Code
Qty
F1
1
F2
1
F1
F3
1
F4
2
F10
1
1
F2
1
F12
2
66
6
Used for all sections so
F4
F4
M610
quantity not listed in this
or other parts lists.
2
2
F3
Glass
Step
1
Bolt the vent side bars
loosely to the vent top bar
as shown.
Notes:
• The assembly is slightly different for glass and
•
polycarbonate glazing.
• Glazing sheets are from separate glazing packs.
Bolt the vent mounting bar
(F1) onto the roof bars
using the bolts previously
inserted (section D, step 5).
Adjust to butt up to the
Note: Assembly is different
for polycarbonate and glass -
see illustration.
Poly
Outside view
F1
vent and tighten.
D3
Step
2
Screw vent stay to vent
Fit nuts and bolts to the
F10
bottom bar using the pre-
bottom ends of the vent
drilled holes.
sides but do not tighten.
Slide the glazing sheet into
place.
Add the vent bottom bar.
Check that the vent is
square and tighten all nuts.
F3
D1
Slide completed vent along
Screw the vent stay catches
the ridge bar until in
to the vent mounting bar
position.
using the pre-drilled holes.
F12
Outside view
Pictures viewed from inside the Greenhouse except where stated
For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828