Page 7
B Greenhouse Ends
Profile
Code
Qty
C3-3/C3-4
2
4
D4-1
1
C4-4
C4-3/C4-4
2
7
1
D4
G1-1
G1
2
6
G1-1
2
C3-4
B3-1/B3-2
2
B3-2
H1
H1
2
G1
C1-1
2
5
2
G2
2
C1-1
Used for all sections so
3
This is the right end viewed from inside. Reverse for left end.
Lay the parts on the
M610
quantity not listed in this
or other parts lists.
Step
4
This section is the
same for both ends
until the door
fitments are added.
See section C.
ground as pictured and
assemble loosely. Check
that the corner
verticals, glazing
uprights and the roof
bars are in the correct
positions (left and right
sides are different).
Before bolting the
glazing uprights to the
outside of the roof
bars, insert bolt into
the channel for fixing
B3
the horizontal brace.
C4
Step
1
Step
5
G2
Corner joint assembly:
Bolt the diagonal
bolt the corner plates
braces to the inside of
(G2) to the inside of
the bottom bars.
the roof and vertical
G1-1
bars. Bolt the
horizontal and
G1
H1
diagonal braces inside
the corner plates.
Step
2
&
3
Bolt bottom bars to
corner and glazing
B3
verticals.
Note: the flat side of
the bottom bar faces
G1-1
inwards.
D4
Step
6
Bolt the horizontal braces
to the inside of the
glazing uprights using the
bolts inserted. See step
4
Step
7
Bolt the brace (D4) to the
chosen non-door end
using the same bolts. Bolt to
(C3) upright also.
Pictures viewed from inside the Greenhouse except where stated
For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828