D Greenhouse Assembly 

Profile 

Code 

Qty 

& Roof Section 

C4-3/C4-4 

 

5  

D2 

 

D3-1 

 
 

D4 

5  

G3 

 

Used for all sections so 

 

M610 

quantity  not  listed  in  this 
or other parts lists.  

 

 

Step 

Bolt the ridge bar to the 

underside of the end roof 

 
 
 
 
 
 

 

Step 

In this section, the three 
greenhouse walls are 
joined together and the 
roof added. This phase is 
best undertaken by two 
people. 
Fit the profile end caps to 
the roof and upright bars 

Outside view 

before assembly. 

D1 

edge bars (C4) as shown. 

C4 

Step 

Bolt the roof glazing bars 
to the ridge and gutter 
bars, remembering to 
insert two bolts into each 
channel for the vent and 
braces to be fitted. 

 
Step 

Bolt the bottom side and 

front bars to the inside of 

the corner post. 

D4 

 
 
 

D3 

 

Step 

Bolt the gutter side bar 

to the inside of the 

corner sections. 

Add braces (D4) to the mid 
points of the roof bars using 
the bolts already inserted 
and holes in the roof edge 
beams. 

Lift  the  frame  onto  the  prepared 

base  and  fix  loosely.  Check  that 

the frame is square and sits 

nicely on the base before  
tightening all nuts. Mark and  

drill wall holes in line with the 
fixing holes in the ridge bar and 

the wall uprights. Plug and screw 
firmly into place.  

 
Pictures viewed from inside the Greenhouse except where stated 
 

For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828 

Summary of Contents for Lean-to Greenhouse

Page 1: ...rs of Summer Garden Buildings after ordering For advice before you buy you can phone us free 7 days a week on 0800 9777828 or visit www summergardenbuildings co uk For 6ft x 4ft 1 93m x 1 27m Lean to model For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828 ...

Page 2: ...rtical Right 1 B3 2 Corner Verticals 2 H1 Door and Back End Lower Horizontal Left 1 C1 1 Door Runner Support Left End 1 C2 1 Door Runner Support Right End 1 C2 2 Door Upright Wall End Left 1 C3 3 Door Upright Wall End Right 1 C3 4 Roof Edge Beam Left 1 C4 3 Roof Edge Beam Right 1 C4 4 Door Runner 1 C5 1 Front and Back End Short Horizontal Braces 2 G1 1 Ridge Beam 1 D2 Roof Glazing Bar 2 D3 1 Door ...

Page 3: ...9 Door Bottom Runner Screws No 6 x 19 4mm 2 619W Door Runner Wheel Bolts M4 x 16 2 M416 Nut For M416 M4 2 M4 1 Washer For M416 M4 2 M4 2 Door Spacer Bolt M6 x 40 1 M640 Nut For M640 M640 1 M6 1 Door Seal 1610 2 E10 Door Base Sliders 2 E11 Door Runner Wheels 2 E12 Door Gear Spacer 1 E13 Door Handle 1 E14 Vent Stay 1 F10 Vent Catch 2 F12 Vent Catch Screws No 6 x 6 8 66 Glazing Clips 112 G4 Rubber Gl...

Page 4: ... a spirit level is required Base options construction The use of our purpose made galvanised steel base is recommended They are made to fit these greenhouses It is easier to maintain a level and square foundation They are easy to install requiring little expertise full instructions are included in the pack Bases can also be constructed from bricks blocks or mounted on a concrete pad The bricks or ...

Page 5: ...le Lay out the parts by greenhouse section ideally around the base as shown and check that all are present before commencing construction Lay on cloths or plastic sheets if there is any risk of scratching the parts Follow the construction sequence Side section Door and Back ends Door Support Gear Frame assembly and roof Door Vent Glazing All illustrations are based on viewing the parts from the in...

Page 6: ...ng A3 the diagonal braces Step 1 Step 4 A3 Insert bolt into the Use the inserted channel in the bolts see 3 to upright A3 secure the diagonal Bolt glazing uprights braces to the to the outside of the G1 uprights Do not bottom bar tighten yet A1 A3 Step 2 Step 5 G1 Bolt diagonal braces Bolt the diagonal to inside of bottom brace to the inside of bar the top gutter bar Repeat for the other A1 Note t...

Page 7: ...to the outside of the roof bars insert bolt into the channel for fixing B3 the horizontal brace C4 Step 1 Step 5 G2 Corner joint assembly Bolt the diagonal bolt the corner plates braces to the inside of G2 to the inside of the bottom bars the roof and vertical G1 1 bars Bolt the horizontal and G1 H1 diagonal braces inside the corner plates Step 2 3 Bolt bottom bars to corner and glazing B3 vertica...

Page 8: ...de of the roof bars on both ends of the greenhouse C2 Door C2 Stop Outside view C5 E6 bolt into the end hole of the door runner bar to act as a door stop Step 5 Fit the support arm E6 as shown Using a bolt inserted into C5 at the top B3 Step 2 E6 Step 6 Insert bolts from the C5 Bolt M640 and spacer outside through the door E13 at the bottom frame top bar and E13 through the support clips E9 and at...

Page 9: ... to insert two bolts into each channel for the vent and braces to be fitted Step 2 Bolt the bottom side and front bars to the inside of the corner post D4 D3 Step 3 Bolt the gutter side bar to the inside of the corner sections Add braces D4 to the mid points of the roof bars using the bolts already inserted and holes in the roof edge beams Lift the frame onto the prepared base and fix loosely Chec...

Page 10: ... washing up liquid to ease fitting Note Stretching can occur whilst fitting Allow a few minutes to shrink back before trimming E1 E4 E2 E1 Step 2 3 Screw through the uprights into the door middle bars and top bar Ease the door into position gently pushing the base slider onto the bottom track Outside view E5 E5 E2 Fix the door running wheels to the runner housing as shown and bolt the housing to t...

Page 11: ...t to butt up to the Note Assembly is different for polycarbonate and glass see illustration Poly Outside view F1 vent and tighten D3 Step 2 Screw vent stay to vent Fit nuts and bolts to the F10 bottom bar using the pre bottom ends of the vent drilled holes sides but do not tighten Slide the glazing sheet into place Add the vent bottom bar Check that the vent is square and tighten all nuts F3 D1 Sl...

Page 12: ...se with a number of accessories including 1 Tier Staging 2 Tier Staging Fold away Staging Fold away Shelf Auto Vent Louvre Vent Rainwater Kit Ridge Decoration For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828 Summer Garden Buildings does not guarantee that this is the most recent version of these instructions or that all data has been accurately repro...

Reviews: