Page 9
D Greenhouse Assembly
Profile
Code
Qty
& Roof Section
C4-3/C4-4
1
5
4
4
D2
1
D3-1
2
1
&
3
D4
2
5
G3
4
Used for all sections so
1
&
3
M610
quantity not listed in this
or other parts lists.
Step
4
Bolt the ridge bar to the
underside of the end roof
2
Step
1
In this section, the three
greenhouse walls are
joined together and the
roof added. This phase is
best undertaken by two
people.
Fit the profile end caps to
the roof and upright bars
Outside view
before assembly.
D1
edge bars (C4) as shown.
C4
Step
5
Bolt the roof glazing bars
to the ridge and gutter
bars, remembering to
insert two bolts into each
channel for the vent and
braces to be fitted.
Step
2
Bolt the bottom side and
front bars to the inside of
the corner post.
D4
D3
Step
3
Bolt the gutter side bar
to the inside of the
corner sections.
Add braces (D4) to the mid
points of the roof bars using
the bolts already inserted
and holes in the roof edge
beams.
Lift the frame onto the prepared
base and fix loosely. Check that
the frame is square and sits
nicely on the base before
tightening all nuts. Mark and
drill wall holes in line with the
fixing holes in the ridge bar and
the wall uprights. Plug and screw
firmly into place.
Pictures viewed from inside the Greenhouse except where stated
For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828