Page 10
E Greenhouse Door Assembly
Door
Profile
Code
Qty
Assembly
E1
2
3
3
Parts
E2
E5
E2
1
E3
1
E4
2
2
E4
E5
2
2
619
14
619W
2
E4
2
2
E12
2
M416
2
M4-1
2
E1
E1
M4-2
2
E10
2
E3
E11
2
1
1
Used for all sections so
M610
quantity not listed in this
or other parts lists.
E1
619
619W
Step
1
E3
Push the plastic door base
sliders into the door bottom
bar as shown.
Screw through the uprights into
the bottom bar and the slider.
E11
Insert the door seal into the
door uprights and trim to
length. Lubricate with
vaseline or washing up
liquid to ease fitting.
Note: Stretching can occur
whilst fitting. Allow a few
minutes to shrink back
before trimming.
E1
E4
E2
E1
Step
2
&
3
Screw through the uprights into
the door middle bars and top
bar.
Ease the door into position,
gently pushing the base
slider onto the bottom
track.
Outside view
E5
E5
E2
Fix the door running wheels
to the runner housing as
shown and bolt the housing
to the door top rail.
Slide the running wheels
onto the top track.
Adjust the position of the
running wheels in the wheel
housing for smooth running
of the door.
Pictures viewed from inside the Greenhouse except where stated
For sales advice before you buy phone Summer Garden Buildings free 7 days a week on 0800 9777828