SE
GPS S
YSTEM
S
ETTINGS
T
ASK
C
ONTROLLER
Depending on the capacity of the
(boom section
control system task controller)
which is incorporated in the ISOBUS console, the confi gura-
tion of the distribution area may vary.
.
For top-performing systems, the position of the 12 boom
sections will be adjusted automatically.
In this case the distribution area will appear in the form of
a crescent.
- The consistency of the values for each boom section
based on the working width must be checked.
For example, the distance between the GPS antenna and
the centre of the distribution area must not exceed a half-
width. The cumulative width of the boom sections must not
exceed the total working width programmed in the console.
- Also check the value of delays for the opening
(2 seconds) and the closing (2 seconds).
Depending on the performance of the GPS used it may
be necessary to change the values for the delays.
The drawing on the page opposite represents the distribution
area in the form of a straight line. When the task controller
cannot work the distribution area in the form of a crescent, it
must be programmed in the form of a straight line.
The table opposite shows the diff erent parameters that
relate to the 12 boom sections.
These parameters must be entered into the boom section
control system and/or guidance bar.
The values indicated take into account the type of fertilizer
spreader as well as the working width used.
32 44
ᇗ
Set of vanes on the machine.
ᇗ
Working width (spreading) in metres.
%
ᇗ
Recommended percentage overlap rate.
T (s) O
ᇗ
Expected time taken to control the opening of
the shutters, in seconds.
T (s) C
ᇗ
Expected time taken to control the closing of
the shutters, in seconds.
EN
I
NSTÄLLNINGAR
AV
GPS-
SYSTEMET
FÖR
JOBBSTYRENHETEN
Beroende på kapaciteten hos den
(jobbstyrenhet
med funktion för styrsystem till lyftarmsdel) som fi nns
inbyggd i ISOBUS manöverpanel, kan det skilja sig mellan
hur spridningsområdet konfi gureras.
.
För system med topprestanda justeras läget för de tolv
lyftarmsdelarna automatiskt.
I detta fall framstår spridningsområdet i form av en
halvmåne.
– För varje lyftarmsdel måste man kontrollera att värdena
är rätt baserat på arbetsbredd.
Till exempel får inte avståndet mellan GPS-antenn och
spridningsområdets mittpunkt överstiga en halv bredd.
Den samlade bredden för lyftarmsdelarna får inte
överstiga den totala arbetsbredd som programmerats i
manöverpanelen.
– Kontrollera också de värden för fördröjning av öppning
(2 sekunder) och stängning (2 sekunder) som visas.
Beroende på prestanda för den GPS som används kan
man behöva ändra värdena för fördröjningen.
I ritningen här intill visas spridningsområdet i form av
en rak linje. När jobbstyrenheten inte kan arbeta med
spridningsområdet i form av en halvmåne, måste det
programmeras i form av en rak linje.
I tabellen här intill visas de olika parametrar som rör de tolv
lyftarmsdelarna.
Dessa parametrar måste anges i styrsystemet för
lyftarmsdelen och/eller för riktstången.
De värden som anges beaktar typen av gödningsspridare
och vilken arbetsbredd som används.
32 44
ᇗ
Skoveluppsättningar på maskinen.
ᇗ
Arbetsbredd (spridning) i meter.
%
ᇗ
Rekommenderad grad av överlappning i
procent.
T (s) O
ᇗ
Den tid i sekunder det förväntas ta att öppna
luckorna.
T (s) C
ᇗ
Den tid i sekunder det förväntas ta att stänga
luckorna.
I
79
2
Programming / Programmering
I
Summary of Contents for Isobus X Series
Page 4: ...4 Notes Anm rkningar 4...
Page 6: ...6...
Page 8: ...1kg 1 2 3 3 6 6 4 7 7 5 5 9 8 8 A Pr sentation Presentation...
Page 10: ...10 A Pr sentation Presentation 1 2 2 3 6 6 4 4 7 5 9 9 10 8...
Page 12: ...12 Pr sentation Presentation B...
Page 14: ...14 Pr sentation Presentation C 3911kg 3911kg 3911kg 1 2 4 5 5 6 3...
Page 16: ...16 Pr sentation Presentation C 3911kg 3911kg 3911kg 7 7 1 11 10 13 8 8 9 1 12...
Page 18: ...18 Pr sentation Presentation C 3911kg 3911kg 3911kg 7 7 1 11 10 13 8 8 9 1 12...
Page 20: ...4 1 2 2 6 5 3 3 20 Pr sentation Presentation C...
Page 22: ...22 Pr sentation Presentation C 1 2 3 6 4 5...
Page 24: ...6 6 4 4 8 5 7 7 2 1 3 24 Pr sentation Presentation C...
Page 26: ...26 A Programming Programmering...
Page 28: ...28 Programming Programmering B 1 2 3...
Page 30: ...30 Programming Programmering B 1 2 3...
Page 32: ...WPB WPB STOP GO 3 3 ECONOV ECONOV STOP GO 5 3 3 1 2 4 32 Programming Programmering C 1 2...
Page 34: ...34 Programming Programmering WPB WPB STOP GO 3 3 WPB WPB STOP GO 5 3 3 1 2 4 C 1 2...
Page 36: ...36 Programming Programmering C WPB WPB STOP GO 3 3 WPB WPB STOP GO 5 3 3 1 2 4 1 2...
Page 38: ...38 Programming Programmering D...
Page 40: ...40 Programming Programmering D...
Page 42: ...42 Programming Programmering D...
Page 44: ...44 Programming Programmering D...
Page 46: ...46 Programming Programmering E...
Page 48: ...48 Programming Programmering E...
Page 50: ...1234 50 Programming Programmering E...
Page 52: ...52 Programming Programmering E 1234...
Page 54: ...54 Programming Programmering F...
Page 56: ...F 56 Programming Programmering...
Page 58: ...x1 G 58 Programming Programmering...
Page 60: ...60 Programming Programmering H...
Page 62: ...62 Programming Programmering H...
Page 68: ...68 Programming Programmering H...
Page 70: ...70 Programming Programmering H...
Page 72: ...72 Programming Programmering I...
Page 74: ...74 Programming Programmering I...
Page 76: ...76 Programming Programmering I...
Page 84: ...84 Programming Programmering J...
Page 86: ...86 Programming Programmering J...
Page 88: ...88 A Start up Start...
Page 90: ...90 Start up Start A...
Page 92: ...92 Start up Start B...
Page 94: ...94 Start up Start B...
Page 96: ...96 Start up Start C...
Page 98: ...98 Start up Start C...
Page 100: ...100 A Information Information...
Page 102: ...102 Information Information B...
Page 104: ...104 Information Information C...
Page 106: ...106 Information Information C...