Assembly & Installation
28
Figure 31
- Primary Carriage Junct Box and Tilt Switch Wiring
80 Connect:
Black wire with male spade from black tilt-
switch cord to
1 white wire with female spade from primary
carriage junction box.
81 Connect:
White wire with female spade from same end
of black tilt-switch cord to
1 black wire with male spade from primary
82 Connect:
Female spade on remaining white wire from
primary carriage junction box to
Remaining black wire with male spade from
XII.
Installing Machine
For part numbers and descriptions of parts
referenced in this section, see parts assembly
manual, page 53.
83 Raise machine to top of bin so that outside drive
wheel end rests on track.
WARNING!
Keep people away when raising
machine with jacks or when working on
machine after it is raised. Falling items may cause
death or serious injury. Fasten cable to equipment
and ensure jacks are securely anchored. Winch
should be securely locked before releasing handle.
Never permit anyone on or under the equipment
being moved or raised.
Cable must be securely fastened to the equipment
and to the winch drum. Always ensure cable is
pulling straight off the winch and is not in contact
with the frame or drum sides. Always prevent cable
from rubbing against fixed objects.
Always inspect cable and hook before each use to
ensure they are not damaged. Replace cable if it is
frayed or kinked. If cable or hook breaks, cable can
act like a whip and inflict serious injury to anyone in
its path. Never stand alongside cable or guide it by
hand. Operate jacks with a firm grip, never with wet
or oily hands.
Never leave equipment unattended when hanging
by the winch or allow unauthorized persons to
operate the winch.
84 Securely wire end of crosstube that rests on
track to track in order to avoid movement during
machine installation.
85 Bolt hangers to peak ring support band.
Figure 32
- Preparing Machine for Hanging
85.1
Note:
In Sukup bins ordered with Fastir units
and in all Sukup bins 40’ and larger, a support
band is located inside the peak ring. In non-
Sukup bins, hangers bolt only to peak ring.
86 Bolt chains in hangers using keyhole slots,
adjusting chains so crosstube is level.
Figure 33
- Leveling Crosstube During Installation
XIII.
Installing Rotating Contact
For part numbers and descriptions of parts
referenced in this section, see parts assembly
manual, page 53.
Summary of Contents for Fastir
Page 4: ...Limited Warranty 4 LIMITED WARRANTY...
Page 50: ...Appendix A Wiring Diagrams 50 Figure 52 Double Auger Fastir Wiring Diagram...
Page 51: ...Appendix A Wiring Diagrams 51 Figure 53 Triple Auger Fastir Wiring Diagram...
Page 52: ...Appendix A Wiring Diagrams 52 Figure 54 Quadruple Auger Fastir Wiring Diagram...