Assembly & Installation
31
105 Slide bottom bearing down and bolt to carriage
with 7/16” x 1-1/4” bolts and 7/16” lockwashers
and nuts. Tighten using 11/16” & 5/8”
wrenches.
Figure 38
- Installing Down Auger on Carriage
106 Position a punch in unused hole on locking
collar and
lightly tap
with hammer in direction
of shaft rotation (CW when viewed from above).
106.1
Note:
Do not overtighten collar
- bearing
race will crack.
107 Tighten set screw on bottom locking collar
using hex (Allen) wrench.
108 Ensure there is clearance of approximately 1/4”
between down auger and crosstube.
109 Ensure there is still clearance of approximately
1/16” (thickness of credit card) between
crosstube and bearing blocks.
Figure 39 -
Side View of Primary and Satellite Carriages
110 Mount belts to 9” pulley on down auger and
pulley on motor, aligning if necessary.
110.1
Note:
Pulley should touch bearing lock
collar.
111 Mount center carriage shields to carriages.
Holes in shield must be aligned with slots in
corners of top carriage plate.
112 Bolt center carriage shield to carriage using
1/4” x 1” bolts and tighten using 7/16” wrench.
113 For
Fastir
unit, bolt on cord support strap and
tie-strap cord onto bar of primary carriage. For
Fastir Plus
unit, tie-strap cord to bars of
primary and outside satellite carriages.
114 Bolt plastic cord holders (with black cords
through them) onto carriage shields using
screws provided with cord holders and tie-strap
cord to cord support strap.
Fastir carriages should now appear as in Figure
11 on page 14.
XVII.
Final Steps
For part numbers and descriptions of parts
referenced in this section, see parts assembly
manual, page 53.
115 Have electrician provide liquid-tight elbow and
drip loop and bring electrical service into cast
electric junction box attached to center hanger,
wiring to leads of rotating contact.
Figure 40
- Rotating Contact Wiring Diagram
116 Have electrician provide an electrical
disconnect/on-off switch at top of bin to ensure
machine cannot be turned on accidentally during
service and for more convenient operation.
117 Ensure crosstube is unwired before operation
(See step 84).
118 Ensure entire length of track and bin sidewall
are free from obstructions that could hinder
movement of crosstube or outside carriage and
auger around bin.
- - -
INSTALLATION COMPLETE
- - -
Summary of Contents for Fastir
Page 4: ...Limited Warranty 4 LIMITED WARRANTY...
Page 50: ...Appendix A Wiring Diagrams 50 Figure 52 Double Auger Fastir Wiring Diagram...
Page 51: ...Appendix A Wiring Diagrams 51 Figure 53 Triple Auger Fastir Wiring Diagram...
Page 52: ...Appendix A Wiring Diagrams 52 Figure 54 Quadruple Auger Fastir Wiring Diagram...