7
/05.2015/
opt_CRS
EN
This option will be delivered loose and includes the following parts:
4x levelling castors
4x washers
4x screws M8x16
12.6 Levelling castor
Installation
We recommend to mount the castors while the A/C
unit is on the pallet. For this purpose, the device must
be rotated by 90 °.
Open the unit front door, insert an M8 screw through
the washer into the opening provided in the bottom
of the unit, hold the castor against it and tighten the
screw in the threaded hole of the levelling castor.
Install both castors at the front side and the two ca-
stors at the rear of the unit by opening the rear door.
Tighten the four castors initially as firmly as possible.
Now you lift the unit from the pallet on the floor. By
the unit's weight it is now possible to tighten the screw
to the specified torque of 16 Nm
Locking and adjusting the height
After you have rolled the A/C unit to the site and
positioned correctly, you can fix the position by lo-
wering the integrated truck lock. First, you turn the
orange gear wheel counterclockwise until the truck
lock touches the ground. For a further lowering of
the lock and raising the A/C unit you need a wrench
with a width of 13mm, which you apply below the
gear wheel.
Minor ground unevenness can be compensated
by lowering the truck lock up to 8 mm beyond the
castor height.
Position at delivery
Unit rotated by 90°
Position of the maximally lowered truck lock
gear wheel
M8 nut
1. screw (M8)
2. washer
3. levelling castor
Lowering the
truck lock
Lifting of the
truck lock
Summary of Contents for CRL 210 CW
Page 68: ......