4
/05.2015/
opt_CRS
EN
Second Power Supply in separate box
This option provides an automatic commutation between two power supply networks.
In case of failure of the main power supply the A/C unit has the possibility to restart operation by commutation to
the second supply network. Both supply lines of the power supply networks are fixed by screw connections and are
directly connected at the main switches. An internal circuit ensures that the priority is set on power supply 1.
All three phases of both power supplies are checked constantly on under-
voltage, phase failure, phase balance and correct rotation. In case of failure
of supply 1 the A/C unit is switched off. After a lapse of time which can be
set at the time relay (preadjusted: 10 seconds) power supply 2 is switched
onto the A/C unit. The A/C unit starts by the automatic restart which is
integrated in the controller.
When the voltage of power supply 1 returns, the A/C unit is switched off
again. On a second time relay a delay can be set (preadjusted: 10 seconds),
after which power supply 1 is switched onto the A/C unit. The A/C unit starts
by the automatic restart.
Two green LED indicators display the active power supply network.
Supply
1
Supply
2
A/C unit
12.4 Electrical Options
Water detector with sensor
It consists of a relay installed inside the e-box and a sensor electrode placed in the area where water risks to collect.
If water is detected the signal is transmitted to a digital input of C7000 to activate the alarm.
• Operating voltage 24V AC
• Sensibility adjustable between 5kOhm and 450kOhm
Restrictions:
• admissible cable impedance: 100nF/km
• maximum cable length: 200m